New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70special

Adobe AD0-E908 Adobe Workfront Core Developer Professional Exam Practice Test

Page: 1 / 7
Total 70 questions

Adobe Workfront Core Developer Professional Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$37.5  $124.99

PDF Study Guide

  • Product Type: PDF Study Guide
$33  $109.99
Question 1

What is a requirement when creating a chart in a report?

Options:

A.

At least one grouping must be defined.

B.

The Advanced Options on a column must be set to aggregate

C.

Charts can be created without any prerequisites.

Question 2

The creative services team often completes continuing education courses or specific certifications to expand their skillset. These hours are not linked to a specific project. They have asked the system administrator to create an hour type that will appear on their timesheet.

What are two steps the system administrator would take to create a new hour type named Training and Certifications? (Choose two.)

Options:

A.

Set the hour type as "General*

B.

Associate the hour type with the creative services team

C.

Create a non-billable project to capture logged time

D.

Uncheck the box "Count as Revenue"

Question 3

The system administrator uses a specially formatted Excel spreadsheet which imports new data or exports existing data from their Adobe Workfront instance.

What feature native to Adobe Workfront is the system administrator using?

Options:

A.

Report

B.

Kick-Start

C.

An API call

Question 4

What is one of the primary benefits to setting up an automated proofing workflow instead of a basic workflow?

Options:

A.

Read-only and Reviewer roles are automatically granted View access on the document if they had none previously

B.

A series of review stages can be created with dependencies between stages

C.

All required reviewers can access the proof immediately upon creation.

Question 5

An Adobe Workfront system administrator is asked to fix an external web page on a dashboard. The URL for the desired content no longer points to the correct page.

How can the system administrator update the link for the external page?

Options:

A.

Navigate to the dashboard with the broken external page

Click the gear icon in the title area of the external page to edit its properties. Enter the correct URL and save the change

B.

Edit the dashboard with the broken external page.

On the right side of the screen, locate the external page item and click its Edit icon. Enter the correct URL and save the change

C.

Under Setup, expand the Interface section.

Click the External Page link in the left navigation.

Click the page to be updated, enter the correct URL, and save the change

Question 6

A project manager has left the company.

What should the system administrator do to free up their license type while maintaining historical information in Workfront?

Options:

A.

Delete the user and select option to retain their work

B.

Deactivate the user to avoid loss of data

C.

Reassign the license from their access level

Question 7

A project manager would like to have consistent project data fields to be used in the project reports they create. Which two options would address that need9 (Choose two.)

Options:

A.

Custom fields within the Custom Form can be pre-populated with data.

B.

Custom fields can dictate consistent project dashboards.

C.

Custom Forms can identify the best available resource for a specific role within a project.

D.

The Custom Form is attached to the template used for the project creation.

Question 8

An Adobe Workfront System Administrator has been asked to configure timesheet profiles that generate automatically and are sent to managers for approval.

Which two elements of timesheet profiles need to be configured to accomplish this accurately? (Choose two.)

Options:

A.

Specify time interval of automatic timesheet generation (i.e., weekly)

B.

Set approver field to Their Manager"

C.

Provide detailed description of the timesheet profile

D.

Specify projects to appear on the timesheet

Question 9

Which reporting element has an option of conditional formatting?

Options:

A.

Grouping

B.

View

C.

Filter

Question 10

Which two objects can an issue be converted to? (Choose two.)

Options:

A.

Task

B.

Update

C.

Project

D.

Request

Question 11

Which two actions are necessary for a request queue to be visible in the system? (Choose two.)

Options:

A.

Check the box to publish as a help request queue

B.

Add a routing rule to the queue details

C.

Indicate the default fields to be shown on all requests

D.

Ensure that the queue project is within a status that equates to Current

Question 12

A project team has configured a Kanban board with columns for backlog, in progress, on hold, and completed statuses. The project manager wishes to automatically archive cards that have been closed for longer than two weeks.

What should the project manager change in order to make this happen?

Options:

A.

Select Configure > select Cards and enable a two week Card Falloff for the Closed column.

B.

Select the Closed column > select Edit and set Archive Limit to two weeks

C.

Select the three ellipses next to the board name > select Archive and set for two weeks.

Question 13

A designer notices that no tasks associated with a specific project appear on their timesheet. The project owner verified that the designer is assigned to several tasks and that the tasks occur during the week of the current timesheet

Which setting can cause this experience?

Options:

A.

Task assignees must be given contribute access to a project in order for the tasks to automatically appear

B.

A projects status must equate to Current in order for its tasks and issues to automatically appear on timesheets.

C.

All predecessors for a tasks must be complete before they will appear on a timesheet

Question 14

Several team managers within an organization have complained to the system administrator that they have no visibility of what their team's are working on in Workfront. They regularly have to ask for projects to be shared with them to gain visibility of their teams workload which is creating a barrier to collaboration

What action would the administrator take to address this?

Options:

A.

Team Managers should be given System Administrator access so that they can view all items in Workfront for their team.

B.

The access level for project owners should be updated to automatically grant their team manager view access when a project is created

C.

Team Managers across the organization should be given view access to all Project Templates in the system.

Question 15

An admin-level user has created a group status for tasks in projects. The admin notices in testing that the custom task status is only available in some of the projects with assigned Marketing team members.

Why is the group status missing in some projects?

Options:

A.

Projects with the missing group statuseshave team members assigned thatare not associated with the Marketing group

B.

Settings in the project details have not been toggled on to allow the use of custom statuses on tasks within the project.

C.

Group statuses are only available in projects associated with that group in the project details.

Question 16

A Workfront system administrator is creating a new layout template for a group of users. What two items can be customized here? (Choose two.)

Options:

A.

Views, filters, and groupings used with reports

B.

On-screen terminology

C.

User attributes including schedule, group, and job role

D.

What notifications the user can receive

Question 17

A marketing team has identified a new workflow for a digital deliverable process.

What are the three main benefits of utilizing a project template for their new Workflow? (Choose three.)

Options:

A.

Adherence to an accurate, repeatable process

B.

Tasks defined by Custom Forms

C.

Sharing settings completed by default

D.

Pre-created issues

E.

Efficiency in creating new projects

Question 18

A project manager wants to track specific types of issues on a project along with additional custom fields for each type. What is one way to accomplish this requirement?

Options:

A.

Create a custom Issue Type field and add display logic to the Issue View

B.

Enable default issue types for Bug Reports. Change Requests. Issues, and Requests and add display logic for each type

C.

Create a queue on the project and use queue topics to define the issue types and assign custom forms.

Question 19

What are two differences between an issue and a task? (Choose two.)

Options:

A.

Tasks can only be created on projects; issues can be created on projects and tasks.

B.

Tasks can be created by anyone assigned to the project; issues can only be created by the Project Owner

C.

Tasks represent planned work; issues represent unplanned work.

D.

Tasks can have associated constraints; issues can have associated predecessors.

Question 20

On which types of objects can time be recorded in Workfront?

Options:

A.

Tasks. Timesheets and Documents

B.

Portfolios, Tasks and Issues

C.

Projects. Tasks and Issues

Question 21

An organization captures project requests in a request queue. Once the request has been triaged, it is converted into a project and the information captured in the request custom form should be carried over to the project.

How would a developer achieve this?

Options:

A.

Create a multi-object custom form with both the project and issue object types selected

B.

Create a project template and attach an issue custom form

C.

Check the box in the queue details to transfer the issue custom form to a project

Page: 1 / 7
Total 70 questions