Winter Special Flat 65% Limited Time Discount offer - Ends in 0d 00h 00m 00s - Coupon code: netdisc

APICS CPIM-ECO Execution and Control of Operations Exam Practice Test

Page: 1 / 11
Total 105 questions

Execution and Control of Operations Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$42  $119.99

PDF Study Guide

  • Product Type: PDF Study Guide
$36.75  $104.99
Question 1

Control charts are used to do which of the following?

Options:

A.

Determine preventative maintenance schedules

B.

Display variation of the production process

C.

Determine the percentage of output within specification limits

D.

Verify ongoing process capability

Question 2

The implementation of a program designed to reduce changeover times will result in a temporary capacity shortage. This shortage will be handled by using some older equipment and by subcontracting some work. Which of the following methods should the company use to control capacity during this period?

Options:

A.

Kanban

B.

Demand management

C.

Flow control

D.

Input/output control

Question 3

Concurrent engineering is defined as which of the following approaches?

Options:

A.

Competitive design of a product by different groups

B.

Simultaneous design of different modules by the engineering department

C.

Participation of all relevant departments in developing a new product

D.

Redundant systems in design to improve reliability

Question 4

Which of the following concepts is a reason to create a visual factory?

Options:

A.

They are more successful because visual systems are more robust.

B.

They are inexpensive to implement.

C.

They are more successful because they display well for customer visits.

D.

They are successful because they are self-explaining and self-improving.

Question 5

A manufacturing facility is considering adopting cellular flow. Which of the following factors is most important to consider?

Options:

A.

Availability of shipping methods

B.

Maturity of the product line

C.

Distance to the supplier

D.

Stability of the production schedule

Question 6

The best way to determine feasibility of the capacity plan for a work center is to use:

Options:

A.

input/output control.

B.

priority sequencing rules.

C.

order management processing.

D.

rough-cut capacity planning.

Question 7

Which of the following steps should be first in determining operation start dates for capacity planning?

Options:

A.

Input/output control

B.

Forward or backward scheduling

C.

Finite or infinite loading

D.

Order preparation and release

Question 8

The actual output of a work center for a given time period can be determined by evaluating the:

Options:

A.

number of standard hours in the queue.

B.

number of standard hours per units produced.

C.

number of machine hours.

D.

amount of rated capacity less rework.

Question 9

Which of the following actions helps product design and development pursue a strategy of first-to-market?

Options:

A.

Coordinating with product engineering

B.

Developing warranty specifications

C.

Finding the lowest-cost suppliers

D.

Flow-charting current processes

Question 10

Statistical process control is a technique primarily used to:

Options:

A.

implement mistake-proofing techniques.

B.

identify special-cause variation.

C.

reduce preventive maintenance.

D.

reduce the number of inspection steps.

Question 11

Which of the following persons has direct responsibility for the accuracy of production activity reporting?

Options:

A.

Controller

B.

Shop supervisor

C.

Materials manager

D.

Director of manufacturing

Question 12

Based on the data provided, assume that time available per day is 840 minutes. What is the takt time per unit of demand?

{exhibit 4027}

Options:

A.

84.0 minutes

B.

22.1 minutes

C.

2.21 minutes

D.

8.4 minutes

Question 13

The primary reason for using an empty conveyance container as a triggering signal is to:

Options:

A.

communicate the need for material.

B.

keep the original container filled with material.

C.

pull material downstream.

D.

push material downstream.

Question 14

A customer has complained that paint is peeling off a product recently purchased from a supplier. A team is formed in the supplier plant to solve the problem and follow these steps:

{exhibit 534}

Which of the following methods best describes the problem-solving approach used by the team?

Options:

A.

Pareto analysis

B.

Brainstorming

C.

Five why's

D.

Fishbone analysis

Question 15

Structured problem solving provides what essential result to an organization?

Options:

A.

Recognition of problems in the company's competitive position

B.

Resolution of problems of other organizations in like markets or with similar customers

C.

Recognition of problems with the company's management team

D.

Resolution of both strategic and operational problems

Page: 1 / 11
Total 105 questions