Summer Special Flat 65% Limited Time Discount offer - Ends in 0d 00h 00m 00s - Coupon code: netdisc

EMC D-VXB-DY-A-24 Dell VxBlock Deploy Achievement Exam Practice Test

Dell VxBlock Deploy Achievement Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$42  $119.99

PDF Study Guide

  • Product Type: PDF Study Guide
$36.75  $104.99
Question 1

A Customer Engineer just connected to their new VxBlock 1000 that was shipped with NSX. From where can the Customer Engineer confirm that the correct vSphere clusters

are prepared for NSX?

Options:

A.

NSX Controller

B.

vCenter Web Client

C.

NSX Manager VAMI

D.

ESXi host VIBs

Question 2

Match each Dell Unity system DAE capacity to the corresponding maximum number of supported 2.5 inch drives.

Options:

Question 3

Where is customer feedback captured during the Lessons Learned phase of the project closure?

Options:

A.

Project Feedback Form

B.

Project Workbook

C.

Configuration Reference Guide

D.

Customer Satisfaction Survey

Question 4

Which document provides a representation of all the connections on the recently upgraded switch?

Options:

A.

Port Map

B.

Switch Administration Guide

C.

Solutions Abstract

D.

Switch Release Notes

Question 5

A VxBlock 1000 is running VMware vSphere 6.7. To support an audit, a customer engineer is trying to map the networking components in the VxBlock to a traditional datacenter

architecture.

Which component should the engineer map to the access switch?

Options:

A.

VMware virtual distributed switch

B.

Fabric Interconnect

C.

Nexus 1000V switch

D.

Nexus 9306PX switch

Question 6

What VMs are part of VxBlock Central?

Options:

A.

Multi-system Prepositioning (MSP), Element Manager, ESRS

B.

ESRS, Element Manager, Core

C.

Core, Multi-system Management (MSM), Multi-system Prepositioning (MSP)

D.

Element Manager, Multi-system Management (MSM), Multi-system Prepositioning (MSP)

Question 7

Based on the Dell EMC RCM Workbook upgrade plan, in what sequence should VxBlock components be upgraded?

Options:

Question 8

Which base feature of Isilon OneFS is enabled during the CPSD Logical Build process?

Options:

A.

SynclQ

B.

SMARTDEDUP

C.

SMARTCONNECT

D.

SnapshotIQ

Question 9

A standard virtual switch is deployed on an ESXi host. Four virtual machines are connected to the vSwitch, which has no uplink ports configured.

Which statement is accurate about network connectivity between the VMs?

Options:

A.

All VMs can communicate, but only with one another.

B.

VMs can only communicate with one another if virtual guest tagging is used.

C.

No communication is possible between VMs.

D.

VMs can communicate to outside networks if CDP is being used.

Question 10

What service is provided by a VMKernel NIC?

Options:

A.

vMotion

B.

vCenter management

C.

VDS management

D.

System control

Question 11

What is the standard expected timeline to complete an RCM upgrade?

Options:

A.

2 months

B.

8 business days

C.

6 weeks

D.

3 weeks

Question 12

According to the Test Plan guidelines, how should you validate redundancy capabilities of the network during a system failure?

Options:

A.

Remove one Aggregation switch power supply

B.

Disable the primary interface on Switch-A

C.

Power off the primary ToR switch

D.

Remove one power module from ToR switch A

Question 13

Which logical entity in ACI allows for logical separation and reuse of IP address space within an ACI fabric?

Options:

A.

EPG

B.

VLAN

C.

Context

D.

Tenant

Question 14

A user cannot connect to Management switch 3172TQ. During troubleshooting it was discovered that the wrong IP was used in the SSH client.

What IP address should be used to establish the SSH connection to the Management switch?

Options:

A.

192.168.1.1

B.

10.10.10.2

C.

192.168.1.2

D.

10.10.10.1

Question 15

Refer to the exhibit.

A cable with the following label was connected to the wrong equipment type:

* M91A-01:01 U61A-01:09

Based on the exhibit, what is the target equipment type?

Options:

A.

Nexus 9xxx, Slot A, Port1

B.

UCS 5108 Chasses A, Slot 1, Port 9

C.

MDS 9xxx, Slot 1, Port 1

D.

UCS 6xxx FI, Uplink A, Slot 1, port 9

Question 16

Which NSX VMs run in the VxBlock AMP cluster?

Options:

A.

NSX Edge gateways and NSX DLR

B.

NSX Controllers and ESGs

C.

NSX Manager and NSX Controllers

D.

NSX Controllers and NSX Edge gateways

Question 17

A VxBlock 1000 UCS domain is being managed via Fabric Interconnect (FI) A as the cluster lead. The expansion team adds two new B-series servers to the domain. When

attempting to vMotion from the existing blades to one of the new blades, the power to Fabric Interconnect A is disconnected.

What is the expected result?

Options:

A.

vMotion completes successfully, but access to the vCenter will be lost

B.

vMotion fails, but is automatically retried once the Fl comes back online

C.

vMotion fails because the Fl managing the session is powered off

D.

vMotion completes successfully despite the FI power failure

Question 18

How are policies applied within an ACI fabric?

Options:

A.

Between two or more EPGs; all EPGs can be either unidirectional or bidirectional

B.

Between two or more EPGs; all EPGs must be bidirectional

C.

Between only two EPGs; both EPGs can be either unidirectional or bidirectional

D.

Between only two EPGs; both EPGs must be unidirectional

Question 19

A VxBlock 1000 system is being deployed at a customer site. The system is equipped with a Nexus 93180YC aggregation switch to support routing features. A Juniper switch is

used at the customer site as the core switch. The customer intends to run a dynamic routing protocol between the Nexus and Juniper switches.

Which routing protocol is recommended?

Options:

A.

EIGRP

B.

IGMP

C.

IGRP

D.

OSPF

Question 20

A System Engineer is working on an implementation of the VxBlock 1000. What is a required task in the final implementation step during the Deployment Phase?

Options:

A.

Verify system physical configuration against LCS

B.

Execute the agreed-upon test plan

C.

Configure Cisco Smart Call Home

D.

Connect to individual Element Managers

Question 21

Who is an optional resource during an RCM upgrade escalation?

Options:

A.

Assessment Lead

B.

Program Manager

C.

Project Manager

D.

Delivery Manager

Question 22

What is encapsulated by a VxLAN?

Options:

A.

Layer 2 Ethernet frames in Layer 3 UDP-IP packets

B.

Layer 3 Ethernet frames in Layer 2 UDP-IP packets

C.

Layer 3 UDP-IP packets in Layer 2 Ethernet frames

D.

Layer 2 UDP-IP packets in Layer 3 Ethernet frames