The pipes of a VESDA smoke detection system are installed at the air intake of the air conditioner inside the computer room.
Is this a good practice from an early smoke detection point of view?
The humidity in the computer room has changed from about 50% down to 35% Relative Humidity (RH).
What influence does this have on Electrostatic Discharge (ESD)?
What is the main reason to install Earth Leakage protection?
You need to determine the strategy for the cooling audit. All the servers are based on a front-to-rear (F-R) airflow design.
Which location for the temperature/humidity measurement should you recommend for the audit?
A data center has its own power supply from the public utility and receives chilled water supply from the building owner.
What needs to be taken into consideration when calculating the PUE?
What precaution shall be taken for cabling leading into an equipment rack when a data center is in a seismic-prone area?
What should be considered when installing overhead data cabling?
When are the wet bulb and dry bulb temperatures identical?
What indicates the breaking capacity of a fuse or breaker?
From the options indicated, what is the correct starting point for the raised floor installation?
Is it allowed to make design changes during the implementation phase?
You have three UPS systems connected in parallel. The UPS systems have an imbalance in the load sharing of approximately 20%.
What should you recommend?
Smoke sensors need to be tested to ensure that they pick up a potential fire in the data center.
What should you recommend?
The noise levels in the data center are approximately 91 dB (A).
Do employers need to take precautions?
What is the main disadvantage of using a ToR (Top of Rack) design?
Which formula is correct?
The logical overview of the data center looks as pictured. To what TIA-942 Rating is this design made based on electrical only?
Three data centers are benchmarked on facilities energy efficiency.
Data center A has achieved a PUE of 2.45.
Data center B has achieved a PUE of 1.20.
Data center C has achieved a PUE of 1.90.
Which of the data centers is operating at the highest facility efficiency?