New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70special

Exin SIAMP EXIN SIAM Professional Exam Exam Practice Test

Page: 1 / 6
Total 56 questions

EXIN SIAM Professional Exam Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$37.5  $124.99

PDF Study Guide

  • Product Type: PDF Study Guide
$33  $109.99
Question 1

The corporate strategy of ZYX contains these objectives:

-Ensure delivery against contracts

-Invest in and tram all ZYX staff

-Reduce operating costs

-Be ready to adapt to change

The ZYX strategy requires that the costs of the service integrator should be as low as possible, and that service levels and high-quality services should be achieved at all times. The CEO wants the new SIAM model to be in place as soon as possible

OUTSCO is a global provider of a range of services, including service integration They have a good reputation as a flexible and reliable service integrator who is willing to amend their SIAM model. They are in the last year of a 10-year contract to provide outsourced services to ZYXUK. Over the last two years the performance and quality of their services has decreased

SIAMRUS is a global provider of service integration services in the manufacturing sector They use a standardized SIAM model with limited flexibility SIAMRUS recently created an outline SIAM strategy for ZYXUK: proposing that they should be the service integrator.

ZYXS is experienced in the service management of corporate services including managing the delivery of service providers The ZYXS IT Director used to be a senior service manager in a small service integration company The ZYXS office location is almost at capacity with no possibility of expansion ZYXS are the developers of NEWBNK, which is strategic to the future of ZYX

The CEO wants to retain as many of the existing service providers as possible

Which is the most appropriate structure and sourcing approach for choosing the service integrator for ZYX?

Options:

A.

OUTSCO as a hybrid service integrator, acting with the service management function ofZYXS

B.

OUTSCO as an external service integrator, providing service integration services to ZYX

C.

SIAMRUS as an external service integrator, providing service integration services to ZYX

D.

ZYXS as an internal service integrator, transferring their application and support services into ZYXD

Question 2

Project NEWGEN is in the Discovery and Strategy stage. SIAMRUS is assisting ZYX with the design of the SIAM model ZYX has decided to use OUTSCO as an external service integrator but they have not yet been appointed.

The CIO is concerned that the retained capabilities might not have the necessary capability to perform their new role in the SIAM model

What is the best course of action?

Options:

A.

Ask the service integrator after they are appointed to create customized role profiles.

B.

Ask staff to apply for a new role with the service integrator in the new SIAM ecosystem

C.

Create a framework for generic role profiles for the retained capabilities

D.

-Ask staff to apply for a new role with the service providers in the new SIAM ecosystem O . Create customized role profiles for all parties in the new SIAM ecosystem

E.

Determine which staff has the right capabilities for their new role

F.

. Have the staff do assessments based on generic role profiles from a framework - Fire those staff from the original organization that are lacking SIAM skills

Question 3

The SIAM Project Board has decided that a big bang implementation approach is unsuitable for ZYX

What is the most likely reason for this decision?

Options:

A.

Agile methods cannot be applied to a big bang implementation approach.

B.

The current service provider contracts have different termination periods.

C.

The service levels must be maintained throughout the entire transition

D.

The ZYXUK Directors want to use the approach suggested by SIAMRUS

Question 4

ZYX has appointed SIAMRUS and the service management staff from ZYXS as a hybrid service integrator They will use the SIAM model from SIAMRUS

The IT staff from ZYXS and ZYXUK will form a new internal service provider. ZYXSAPP. ZYXSAPP will provide the services for application development and application support

ZYXH will provide the retained capabilities The contract with OUTSCO will not bo renewed ZYX wants to start planning the implementation of the SIAM model

What should SIAMRUS do that would most support ZYX?

Options:

A.

Lead the commercial discussions with new and legacy providers

B.

Review the exit management requirements in the contract with OUTSCO

C.

Start the activities to transition ZYXSAPP into the SIAM model

D.

Take on the accountability for deciding on the implementation approach

Question 5

ZYX has appointed a service integrator in addition to measunng specific service provider service levels, the ZYX Board of Directors also wants information on end-to-end process KPIs based on business outcomes

The KPIs that the ZYX Board would like are

-End-to-end availability of services supporting sales activity

-End-to-end resolution time for support requests received from users

-Timeliness of invoice production, distribution and payment

How should the service integrator implement these KPIs?

Options:

A.

Bring the providers together to map the services, and define and agree on the supporting measurements

B.

Engage a team of consultants from SIAMRUS to map the processes and define the calculations required

C.

Review the existing KPIs used by all providers to see which ones can be used as the new KPIs

D.

Request ZYX to produce data definitions and distnbute these to the service providers

Question 6

The CEO of ZYX is proposing a big bang approach for the SIAM implementation.

For what reason does the CEO propose this?

Options:

A.

ZYX has a number of smaller contracts ending within the next few months

B.

ZYX needs to quickly achieve organizational changes in different business units

C.

ZYX would have a clean break from legacy issues including undesirable working practices

D.

ZYX is unwilling to accept the increased risk of a phased implementation

Question 7

ZYX has decided to create an internal service provider for application development and support This new service provider is formed by merging relevant staff from every ZYX company with the necessary capabilities and skills.

This internal service provider will operate from multiple locations, which enables the provision of year-round 24-hour support.

A capability framework for application development and support is drawn up for the new internal service provider

What will the development of the capability framework help to address?

Options:

A.

Establish a process forum for application development and support

B.

Map skill levels for application development and support roles

C.

Support effective working between staff in the different locations

D.

Understand the boundaries and interactions with other service providers

Question 8

ZYX has implemented a SIAM structure, appointing SIAMRUS as the service integrator.

The SIAM strategy is to consolidate to a smaller number of service providers over time as existing contracts expire Until then. ZYX wants all current service providers to be part of the SIAM ecosystem.

What should ZYX do?

Options:

A.

Communicate the SIAM strategy and instruct SIAMRUS to speak to all service providers to explain their role

B.

Draw up a collaboration agreement across all service providers setting out how they will work together

C.

Put a clause in service provider contracts that SIAMRUS is acting on behalf of ZYX or negotiate themselves

D.

Write to all the service providers informing them that SIAMRUS has been appointed as the service integrator

Question 9

OUTSCO is in the final 12 months of their contract with ZYXUK, but they would like to be part of the new SIAM model. However, the quality and performance of services ZYXUK receives from OUTSCO is decreasing

In the new SIAM model, service credits will apply to all service providers ZYXUK has never applied service credits to OUTSCO before

What is the best way to increase the performance of OUTSCO?

Options:

A.

Apply service credits for the breached SLAs, even though service credits were not previously applied

B.

Appoint a ZYXUK project manager to take ownership for resolving the provider s performance issues

C.

Hold reviews between OUTSCO and the ZYXUK service delivery managers to address causes of failure

D.

Make ZYXUK develop an improvement plan with target dates and measures for OUTSCO to follow

Question 10

The ZYXS IT Director has proposed to the CIO that ZYXS should be the service integrator in the new SIAM model. The CIO wants to validate if the necessary capabilities exist in ZYXS. The CIO has asked SIAMRUS to perform the assessment.

What is the first activity that SIAMRUS should carry out?

Options:

A.

Compare the ZYXS service integration capabilities with the SIAM objectives and the target SIAM model

B.

Assess the existing capabilities of each team in ZYXS and determine if they are at the required maturity

C.

Identify and then map the stakeholders, process owners and managers for all services across ZYX

D.

Prepare a heat map to provide a graphical summary of capabilities and show it to the CIO

Question 11

Project NEWGEN is in the Implementation stage. OUTSCO and ZYXD are service providers. ZYXD is still managed by ZYXS.

Services provided by OUTSCO and ZYXD are not performing as expected due to poor conformance with expected processes and behaviors.

What are the most important activities to resolve performance issues?

Options:

A.

- Assess the communication provided by the SIAM staff and the status of the training roll out of OUTSCO and ZYXD - Monitor the alignment of providers’ incentives

. Assign corrective actions to OUTSCO and ZYXD and measure the trend of performance improvements.

B.

Apply service level credits if performance does not improve

. Deliver a SIAM management oversight capability to control the delivery of the OUTSCO and ZYXD

C.

Implement direct subcontractor reporting to minimize impact on other suppliers

- Implement quick fixes to resolve transitional issues and move on to important things

D.

Ensure OUTSCO and ZYXD executives have committed to alion to this approach

Question 12

-ZYX has selected OUTSCO to be the service integrator, provide hosting for the mainframes and servers, and the wide area network for ZYX - ZYXS will provide the service desk for the SIAM ecosystem.

-All other service providers with rolling contracts will continue to provide their services

-The CIO has asked for the development of a tooling strategy for the SIAM ecosystem.

-The CEO wants to achieve an optimum balance between cost and data integrity.

What tooling strategy should ZYX use?

Options:

A.

All service providers use the OUTSCO toolset or integrate their own toolset with OUTSCO's toolset

B.

All service providers use the OUTSCO toolset within six months after transitioning to SIAM

C.

All service providers use the ZYXS toolset or integrate their own toolset with the ZYXS toolset.

D.

All service providers use their own toolsets and integration will be achieved through re-keying

Question 13

The SIAM model in ZYX has been successfully implemented and operational for 6 months All service providers have signed up to multi-party service level agreements and a detailed collaboration agreement. All providers are either using or interfacing with the common ITSM tool.

NETSCO is providing all LAN and WAN services across the group Although NETSCO is consistently achieving all of its service levels and attends all necessary meetings. NETSCO is not contributing to the overall relationship with the other service providers.

The service integrator wishes to address this problem with NETSCO

What action should the service integrator take?

Options:

A.

Do nothing immediately as it is still early in the contract but monitor the contributions from NETSCO.

B.

Hold a meeting with NETSCO to discuss why they are not engaging in the cultural elements of the contract

C.

Reinforce the need for positive cultural engagement from all service providers at the next service provider forum.

D.

There is nothing that the service integrator can do as NETSCO is meeting all of the contracted service levels .

Question 14

ZYXS has been appointed as the service integrator ZYXH will provide the retained capabilities The CEO has asked the ZYXS IT Director to prepare a governance approach for monitoring and measuring service performance that will support the achievement of the strategic objective to ensure delivery against contracts.

What is the best approach?

Options:

A.

ZYXH will monitor the individual service providers with whom they have retained legal contracts and report the findings to ZYXS ZYXS will then integrate this with data gathered from its own contracted service providers to produce an end-to-end report

B.

ZYXH will review the performance of each delivered service in order to determine whether service levels have been achieved ZYXS will monitor its own performance, collect findings from the service providers, and collate these in a summary report to ZYXH

C.

ZYXS will assure delivery of the end to end service ZYXH will monitor the performance of ZYXS and overall achievement of the expected outcomes This includes ZYXH measuring the realization of benefits expected from the transition to SIAM

D.

ZYXS will monitor and measure each individual service provider for fulfilment of contractual targets. Based on reports from ZYXS. ZYXH will assume responsibility for monitoring the implementation of any improvements with the individual service providers

Question 15

The CEO has asked SIAMRUS to assist in the Discovery and Strategy stage. Given this stage, SIAMRUS is not appointed as the service integrator yet. The first task assigned to SIAMRUS is to analyze the current ZYX services and service providers.

OUTSCO has refused to provide any information to SIAMRUS because they are a competitor SIAMRUS still needs information to create a baseline assessment

What is the best approach for SIAMRUS to get the necessary information about OUTSCO and its services'?

Options:

A.

Analyze the current and historic OUTSCO related incidents recorded in the ZYXS service desk tool

B.

Ask the ZYXH contract governance team to formally instruct OUTSCO to provide the information

C.

Rely on the analysis of services and providers included in the report prepared by the CIO

D.

Review the OUTSCO contract and performance reports with the ZYXUK service delivery managers

Question 16

The implementation of NEWGEN will onboard a number of existing service providers at differing levels of maturity. In addition, there will be new services (such as NEWBNK) and service providers (such as those to support planned expansion in the Asia Pacific region).

What would be the most advantageous approach to onboarding?

Options:

A.

Create a standard onboarding approach for all service providers Apply this approach as contracts are renewed created., or extended Use service criticality and an impact assessment to determine the best sequence for onboarding

B.

Prioritize the transition of the least mature service providers in order to maximize an early realization of benefits Delay adding new service providers until the SIAM model is well established to avoid any disruption to the plan.

C.

Review the incident history for current service providers and prioritize transition based onthe volume of incidents with their services in order to quickly improve service quality Add new service providers as required by the expansion

D.

Transition the most mature service providers using a simplified approach as they will be more able to adapt to SIAM Onboard new service providers to take advantage of the Greenfield opportunity they represent Finally onboard the least mature

Page: 1 / 6
Total 56 questions