You have designed an HPE Synergy solution for a customer site. The customer wants to use this solution design as a blueprint to implement the same solution in 200 locations. They want to minimize cost for installation and configuration and therefore plan to order everything Factory pre-installed and pre-configured.
Which HPE tool can you use to document the customer requirements and attach them to the order?
Your customer acquired their Gen10 Plus servers through HPE GreenLake last year. They want to add HPE GreenLake for Block Storage to their GreenLake footprint. They ask you for a quote, and you inform them that you can start this process through their HPE GreenLake Central instance via a wizard-driven application.
What information do you need to gather for the wizard? (Choose two.)
Match the options from left to right.
You are recommending HPE GreenLake Data Services Cloud Console to your customer.
What resource can you use to provide a live walk through of the solution?
A Customer wants to expand their existing HPE SimpliVity cluster. You propose adding a similar size host with newer generation Intel CPUs.
What needs to be done to facilitate adding the new hosts to the cluster?
Match each Data Center Bridging (DCB) protocol component with its description.
What is a correct formula to calculate business value?
Your customer wants to implement an environment for machine learning that requires low latencies and high transfer rates.
Which technology should you recommend to the customer?
You need to include non GreenLake enabled ISVs in a customer solution.
With whom should you engage if you need help with this solution?
Which values does the TCO Calculator provide? (Choose two.)
Which of the following workload services are offered as part of HPE GreenLake Private Cloud Enterprise? (Choose two.)
A customer has asked you to provide a new server and storage platform. They want to minimize the storage and network cabling within their datacenter.
Which technology will help address this customer requirement?
Your customer has requested a proof of concept.
What should be included in your agreement with the customer? (Choose two.)
Compared to OCA, which additional datacenter characteristic is required to configure a solution in SSET?
Which traditional use cases can be handled by HPE GreenLake for Block? (Choose two.)
For each use case, identify whether it is a traditional solution or a hybrid solution.
Match each solution to the appropriate customer.
Which business requirement does a proof of concept fulfill?
You need to determine whether there is resource contention between VMs in an HPE Hyper-V environment.
Which tool should you use?
A customer wants to implement a solution that doesn’t limit any future operational expenditures.
Which type of solution should you choose and why?
Your customer needs the BTU rating for the complete rack level solution you have proposed to ensure it fits their thermal requirements.
Which tools can provide you with this data? (Choose two.)
When should a customer be offered an HPE GreenLake Cloud Service trial?