If Emily is conducting a performance test to determine that a system exposed to a load can respond to a high number of concurrent users during short periods of time that occur on specific days and at specific times, and then return to a stable state.
What type of performance testing is Emily conducting?
SELECT ONE OPTION
Select the ONE option that describes the mechanism used to extract metrics associated with deadlocks and multi threading problems
SELECT ONE OPTION
Which ONE of the following mechanisms is used to make the load test represent a load situation in a real production environment?
SELECT ONE OPTION
(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.
The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.
Question
Assuming there is one boarding every 5 minutes, what should be the minimum front-end processing capacity of the system for the "departing passenger* user? It is assumed that there will be 12 peaks or maximums per hour.
SELECT ONE OPTION
Refer to Base Scenario 1: When you refer to Base Scenario 1, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
•The project follows an iterative and Incremental development life cycle model.
•Development approach: Agile.
Question
Which of the statement(s) below is (are) TRUE regarding how the performance test is undertaken7
1.The performance test can have a dedicated iteration in a specific way.
2.Performance testing should be performed in a cloud-based performance test environment
3.The performance test may be conducted by a specific team.
4.A performance test cycle must be performed in each iteration by the development team (Agile).
SELECT ONE OPTION
What are the main activities of performance test execution?
1.Monitoring all parts of the environment.
2.Setting up the load generation and monitoring tools.
3.Collecting and keeping all results and information related to the test.
4.Generation of a load against the SUT according to a load profile.
5.Parameterize the test scripts.
6.Setting up the system under test.
SELECT ONE OPTION
(REFER TO BASE SCENARIO 2): IV/rerj you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
Throughout the month of January (31 days), the company performed 3,100 departure operations from the Capital City Airport. These departure operations transported 465,000 passengers during the hours of operation, from 07:00 to 23:00.
The departing passengers (one of the most relevant operational profiles) will access the front-end of the application to check in for their flight. It is known that 30% of departing passengers reconnect after checking in to request the boarding pass to be resent or printed.
Question
A performance test will be carried out for which 11,700 transactions will be necessary to simulate an operation similar to that described in the base scenario and the restrictions of this question. How many virtual users will be necessary to achieve this number of transactions and the conditions of the operations?
SELECT ONE OPTION
In which activity of the testing process is the scope of performance testing established?
SELECT ONE OPTION
Identify the correspondences between the aspects (listed from 1 to 4) and factors to be considered(listed from A to D) when selecting performance testing tools.
1.Compatibility.
2.Scalability.
3.Understandability.
4.Monitoring.
1.Level of technical knowledge needed to use the tool.
2.Correlation of the monitoring with the defined transactions.
3.Protocols.
4.Ability to generate load from multiple points of presence.
SELECT ONE OPTION
Identify the activity that is NOT part of the performance test preparation.
SELECT ONE OPTION
Which ONE of the following options represents a principle of performance testing?
SELECT ONE OPTION
Which ONE of the following options is NOT an advantage of aggregating results from performance testing?
SELECT ONE OPTION