The TMMi process area Test Monitoring and Control has a number of specific goals. Which of the following is a specific goal of the Test Monitoring and Control process area?
During the diagnosing phase a TMMi assessment is performed to determine the current maturity status of the organization.
Which activity is performed in addition to the assessment during the diagnosing phase?
Which of the following are NOT specific goals of the TMMi level 5 process area Test Process Optimization?
1. Select test process improvements
2. Determine, plan and implement test process improvements
3. Evaluate New Testing Technologies to Determine their Impact on the Testing Process
4. Deploy test process improvements
5. Monitor product quality against plan and expectations
Which type of TMMi model component is described hereafter?
“The components guide those who implement improvements or perform assessments. Either the practices as described or acceptable alternatives to the practices must be present in the processes of the organization
before goals can be considered satisfied.”
Which of the following statements is FALSE?
Which of the following activities is an activity that will typically be performed as part of the Initiating phase of a test improvement cycle?
Which of the following statements is TRUE?
Which of the following statements about informal assessments is FALSE?
A test process assessment against TMMi levels 2 and 3 has been performed on an international outsourcing software organization. Although many practices, as required by the TMMi model, are already in place, projects suffer from poor test estimations.
Which of the following process areas would need specific attention to address the above mentioned shortcoming?
Map the following TMMi level 5 specific goals to the appropriate TMMi level 5 process area:
Specific Goals
i. New Testing Technologies are Evaluated to Determine their Impact on the Testing Process
ii. Determine Common Causes of Defects
iii. Establish a Statistically Controlled Test Process
Process Areas
Which of the following statements is TRUE with respect to TMMi Levels 4 and 5 in an Agile context?
The three TMMi level 5 process areas, Defect Prevention, Quality Control and Test Process Optimization, all provide support for continuous process improvement.
Which of these process areas is specifically aimed at identifying new testing technologies that may be appropriate and to transition them into the organization?
A test process assessment has been performed at an embedded software organization. All process areas at TMMi Levels 2 and 3 were in scope of the assessment. Many practices required by the TMMi model are already in place, but the organization is missing a master test plan spanning multiple test levels.
Which of the following process areas would most likely need specific attention to address the above-mentioned shortcoming?
Which of the following statements about the Acting phase of the IDEAL improvement model is TRUE?
The evolutionary testing model of Gelperin and Hetzel has served as a foundation for historical level differentiation in the TMMi. The evolutionary testing model describes a number of test phases.
Which of the following phases of the evolutionary testing model is associated with Maturity Level 1 “Initial” of the TMMi?
What is the correct order for the following TMMi maturity levels (from low to high maturity)?
Study the following description:
“Testing is a thoroughly defined, well-founded and measurable process. Testing is perceived as evaluation; it consists of all lifecycle activities concerned with checking products and related work products.”
To which TMMi maturity level does this description apply?
Improvement models can have a staged and/or continuous representation. The TMMi has been developed as a staged model. Which of the following statements is NOT true regarding a staged model?
Test Planning is defined as one of the process areas at TMMi level 2. It introduces practices such as product risk assessment and defining a test approach for the project. Process areas at higher TMMi levels build on these practices and also address product risk assessments and/or defining a test approach.
Which of the following TMMi level 3 process areas most strongly built on the practices and experiences of Test Planning at TMMi level 2?
1) Test Organization
2) Test Life Cycle and Integration
3) Non-Functional Testing
4) Peer Reviews
Which of the following is NOT a TMMi level 2 Process Area?
Which of the following statements is a correct description of the scope of the TMMi model?
In a TMMi assessment, one of the shortcomings stated was the lack of coherency across various test levels and test types being performed. Establishing a master test plan was an improvement action recommended by the assessors. Which TMMi process area addresses a specific goal and specific practices for establishing a master test plan?
TMMi distinguishes between required, expected and informative components.
Which of the following is an example of an informative TMMi model component?
Which of the following is a TMMi level 5 process area?
Given the following assessment phases:
1. Interview phase
2. Planning phase
3. Preparation phase
4. Reporting phase
Which of following orderings matches the generic assessment process?
Which of the following statements regarding formal and/or informal assessment is FALSE?
A test organization is trying to implement an improvement goal to develop a quantitative understanding of product quality, as part of the process area Product Quality Evaluation.
Which of the following specific practices needs to be addressed as part of process area 4.2 (Product Quality Evaluation) specific goal 1 Project Goals for Product Quality and their Priorities are Established?
Consider the following five statements about TMMi level 2 process areas in an Agile context. Which of these statements are true, and which ones are false?
a. Test performance indicators in an Agile context at TMMi level 2 are always more related to team performance (for example, Velocity) than to the end-results of iterations (such as escaped defects).
b. The product risk assessment process for Agile projects will normally take a more lightweight approach than with a sequential lifecycle model.
c. The process area Test Monitoring and Control in an Agile context is not as important as in a traditional methodology, since sticking to a rigid plan is not one of the tenets of the Agile manifesto nor one of the principles of Agile.
d. For TMMi in an Agile project, it is not necessary to have traceability between requirements, test conditions and tests, because test conditions are not part of an Agile methodology.
e. Following the principles of Agile development, the specification of test environments is normally performed closer to test execution than in a sequential methodology, to provide the opportunity for late changes to be implemented.
Which of the following statements is NOT true regarding test documentation in an Agile context?
Which of the following activities are part of the Acting phase of a test improvement cycle?
i. Refine solutions
Ii. Develop Approach
iii. Implement Solution
iv. Develop Recommendations
v. Analyze and Validate
During a TMMi assessment the percentage of process achievement for the Test Planning process area has been determined at 40%.
Which of the following compliance ratings would you assign to Test Planning?
Which of the following specific goals would you be targeting during the implementation of the Test Planning process area?
Advanced Reviews is a TMMi level 4 process area.
To which specific goal of the Advanced Reviews process area does the specific practice “Revise the product risks as appropriate” belong?