ISTQB CT-PT ISTQB Certified Tester - Performance Testing Exam Practice Test

Page: 1 / 4
Total 40 questions

ISTQB Certified Tester - Performance Testing Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$37.5  $124.99

PDF Study Guide

  • Product Type: PDF Study Guide
$33  $109.99
Question 1

Which of the following is a key challenge when testing applications in a cloud environment?

Options:

A.

Limited ability to control test execution timing

B.

Inability to generate significant load

C.

Lack of user behavior simulation tools

D.

Test execution speed being too high

Question 2

You are managing the testing efforts of an existing distributed system that manages inventories of automobile and light truck tires from multiple warehouses across the country. The system is being enhanced to track incoming restocking shipments at the point of entry to the warehouse and outbound sales shipments at the point of shipment from the warehouse, all of which are executed in real-time. System loads traditionally peak on Mondays due to built-up demand from the previous weekend.

You are constructing an operational profile that emulates entities that submit large, bulk orders of greater than or equal to 1600 tires per transaction. You feel the profile you are constructing accurately reflects this type of power purchaser.

Which of the following steps must you take to ensure your operational profile is accurate?

Options:

A.

Execute the performance test with the operational profile and adjust the parameters as needed.

B.

Review and adjust the profile with key stakeholders prior to using it.

C.

Aggregate the specific operational profiles into a single generic profile and use that generic profile for load testing.

D.

Based on the power purchaser information, create operational profiles for low and medium purchasers and use equal proportions of those profiles during the testing.

Question 3

Which of the following can provide measurements for both individual and aggregated elements within a single performance test?

Options:

A.

Aggregated metrics

B.

Process optimization tracking

C.

Measuring underlying transactions

D.

Nested transactions

Question 4

You are heading the testing effort for a system that manages the air/fuel ratio of direct-injection fuel devices built specifically for high-altitude rescue helicopter engines. At altitude, the system must be able to perform in order to make enough air/fuel ratio adjustments per millisecond between fuel and both an on-board source and available ambient air in order to prevent an engine stall due to oxygen starvation. The system is following a sequential development lifecycle.

For this safety-critical software, when is the appropriate point in the lifecycle to identify and define the performance goals?

Options:

A.

After test readiness has been achieved, but before system testing starts

B.

During the requirements phase when the business stakeholders have the opportunity to agree

C.

At the very beginning of the project during the concept stage

D.

During the software design phase when the requirements are set and the design is being defined

Question 5

Which of the following is the most economical solution to minimize costs and time for performance testing for a high-end production client-server platform?

Options:

A.

Isolated lab environment

B.

Cloud-based environment

C.

Mainframe environment

D.

No environment

Question 6

Which of the following is an advantage of using performance monitoring tools?

Options:

A.

They can prevent malicious behavior.

B.

They proactively compile metrics from server logs.

C.

They more easily identify and report multi-threading problems.

D.

They can proactively detect denial-of-service (DoS) attacks.

Question 7

Which of the following is a key reason to include ramp-up and ramp-down periods in a performance test?

Options:

A.

To ensure virtual users complete their transactions within a defined time window

B.

To simulate a more realistic user load pattern and avoid sudden system stress

C.

To provide a buffer for slow-performing transactions to complete

D.

To guarantee that all virtual users remain active throughout the test duration

Question 8

Which of the following is considered a common database protocol?

Options:

A.

ODBC

B.

JUNIT

C.

SMP

D.

MMS

Question 9

Which of the following is a static performance test?

Options:

A.

Usability test of the user interface

B.

Evaluation of the test execution skills of the testers

C.

Review of the network architecture

D.

Formal signature approval by the end users

Question 10

At what point during performance testing does monitoring with the load testing tool begin?

Options:

A.

When testing is concluded.

B.

Before testing execution.

C.

Immediately after test execution.

D.

Simultaneously with test execution.

Question 11

Which of the following is a typical performance risk associated with mobile, browser-based, and embedded real-time architectures?

Options:

A.

Slow hard disk speed

B.

Misconfigured host machine

C.

Unexpected loads due to API accessibility

D.

Internet connectivity issues

Question 12

When following the principal performance testing activities, when are resources allocated?

Options:

A.

During test planning

B.

During test execution

C.

During test evaluation

D.

During test completion