Question 1

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution. Determine whether the solution meets the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to It. As a result, these questions will not appear in the review screen.

A manufacturing company has a new speaker that is available with standard and premium carbon fiber options.

For the premium option, speakers are made to order. Customers can choose from seven product attributes at different prices.

You need to create and configure the product and pricing for the new speaker.

Solution: Create a constraint-based product with configurations. Use a price model to calculate the different configurable option costs.

Docs the solution meet the goal?

Options:

A.

Yes

B.

No

Question 2

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.

A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.

The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.

You need to ensure that the system is set up to support the manufacturing process.

Solution: Create a dimension-based product master with variants and use the trade agreements to specify the different pricing.

Does the solution meet the goal?

Options:

A.

Yes

B.

No

Question 3

You are responsible for product and formula maintenance for a paint manufacturer. You create a formula for white paint and add its lines. When the formula size increases or an ingredient changes, the quantity of the pigment ingredient must be adjusted proportionately. You need to set up the formula line for the pigment. Which formula feature should you use?

Options:

A.

Pegged supply

B.

Step consumption

C.

Scalable

D.

Variable

Question 4

Note: This question is part of a series of questions that present the same scenario. Each question in the series contains a unique solution that might meet the stated goals. Some question sets might have more than one correct solution, while others might not have a correct solution.

After you answer a question in this section, you will NOT be able to return to it. As a result, these questions will not appear in the review screen.

A company implements Dynamics 365 Supply Chain Management and configures the system to support process manufacturing.

The company manufactures pain-relieving lotions. Several of the primary ingredients are delivered at different concentrations depending on the ingredient and vendor. Ingredient A is the primary active ingredient in the lotion. IngredientB is used as a compensating ingredient.

You need to ensure that the system is set up to support the manufacturing process.

Solution: Create a dimension-based product with configurations. Use a price model to calculate the different configurable option costs.

Does the solution meet the goal?

Options:

A.

Yes

B.

No

Question 5

A company implements Dynamics 365 Supply Chain Management.

Due to increased demand and limited space in the work cell area tor product LOOM, you must subcontract overflow work to another company. You have the following requirements:

• Locate a warehouse at the subcontractor building.

• Support picking and shipping activity tracking.

• Associate costs of transporting materials between the locations in the cost of the finished product.

You need to modify the production flow.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE Each correct selection is worth one point.

Options:

A.

Create transfer activities and assign them to the subcontractor.

B.

Create a new production flow version.

C.

Modify the overflow work operation and associate it with the subcontractor.

D.

Create a resource and work cell resource group for the subcontractor.

E.

Modify the overflow work activity and assign it to the subcontractor.

Question 6

You produce 100 total units of finished goods. The amount of material used to produce the goods is the equivalent amount of material needed to produce 105 finished goods.

The company must track variances in material compared to the original estimated amount. You must only use one picking list journal for each production order.

You need to post a picking list that accounts for the material required to produce 105 finished goods.

What should you do?

Options:

A.

Report as finished five additional units in the error quantity field.

B.

When creating the lines for a picking list, set the value of the quantity option to 105.

C.

Post a picking list for 100 to account for the originally estimated amount. Post an additional picking list to account for the equivalent amount of material to produce 5 finished goods.

D.

In the Bill of materials production details, edit the estimated amount for each line to equal 105 units of raw material.

Question 7

A beverage company uses Dynamics 365 Supply Chain Management batch processing for production-

You need to identify the ingredient type used in batch processing when the base attribute of a product is added to a formula line.

What is the ingredient type?

Options:

A.

active

B.

compensating

C.

filler

D.

none

Question 8

A manufacturing plant uses lean manufacturing Operators process Kanban consumption manually using a mobile device.

The production team must use automatic empty registration for some of the event. Unbars Registration must occur when the last job of a Kanban is completed.

You need to update the Kanban rule to meet this requirement.

What Kanban should you update?

Options:

A.

Set a fired Kanban quantity.

B.

Select to register as empty when handling units are received.

C.

Select to register as empty when the source requirement is registered.

D.

Select to manually register as empty

Question 9

You need to create the production orders for standard model bicycles.

Which method should you use?

Options:

A.

Sales order line

B.

Master planning execution

C.

Supply schedule form

D.

Released item

E.

All production orders form

Question 10

You need to create the new summer limited edition bicycle in Dynamics 365 in preparation for taking orders.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Options:

Question 11

You need to determine the sales price for a new limited-edition bicycle for the summer season.

What should you do?

Options:

A.

Run inventory close for the BOM items for the limited-edition bicycle.

B.

Create the production order for the limited-edition bicycle and click estimate.

C.

Run the category price rules for the limited-edition bicycle using a cost-plus calculation.

D.

Run the pricing simulator for the limited-edition bicycle for a quantity of one.

Question 12

You need to configure the bicycles’ production resource.

Which option should you use?

Options:

A.

Exclusive capacity set to yes and enter a Batch capacity.

B.

Exclusive capacity set to no and infinite capacity.

C.

Exclusive capacity set to yes and infinite capacity.

D.

Exclusive capacity set to no and enter a Batch capacity.

Question 13

You need to resolve the issue for UserE.

Which configuration options should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 14

You need to resolve the issue for UserB.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set up configuration and weight for partial visibility.

B.

Create a product master with predefined variants for ounces and boxes.

C.

Set up configuration and weight for full visibility.

D.

Create a catch weight item.

Question 15

You need to resolve the issue for UserC.

Which two options should you configure? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Best before period in days

B.

Best advice period in days

C.

Backward tracing

D.

Forward tracing

E.

Shelf life period in days

Question 16

You need to resolve the issue for UserG.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 17

You need to resolve the production manager issue.

How should you configure manufacturing execution? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 18

You need to configure production operations for the pine and orange scent solutions.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Configure the inventory policy for the item model group to set the value of the Stocked product option to Yes.

B.

Use a purchase agreement as a service agreement.

C.

Allocate subcontracted work in its own cost breakdown block.

D.

Configure a costing resource and requirement to point to a Vendor type resource.

E.

Configure the BOM line to be of type Vendor and associate the corresponding vendor account.

Question 19

You need to configure costing for raw materials used to manufacture unscented cleaning solution.

Which form should you use?

Options:

A.

Cost basis type

B.

Quantity and margin template

C.

Pricing calculation

D.

Pricing template

Question 20

You need to configure lot number control for inventory. Which option should you use?

Options:

A.

Physical inventory

B.

Blank receipt allowed

C.

Blank issue allowed

D.

Primary socking

Question 21

You need to plan scheduling for Customer1’s order of unscented solution.

What are two possible ways to achieve the goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Schedule production based on the availability of raw material.

B.

Split and plan operations in detail for each of the resources.

C.

Schedule productions based on the capacity of the resources.

D.

Run master planning with a specific time fence.

E.

Plan scheduling of the production at the resource group level.

Question 22

You need to calculate estimated consumption of ingredients for liquid cleaning solution.

What is the consumption? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 23

You need to resolve the shop supervisor’s issue.

Which options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 24

You need to configure production control parameters for liquid cleaning solution manufacturing.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Require an electronic signature when the formula is approved.

B.

Select Block editing and approve the formula.

C.

Select the Block removal of approval option for the formula

D.

Select the Block editing option only.

D18912E1457D5D1DDCBD40AB3BF70D5D

Question 25

You need to set up the metal production route and BOM.

Which three actions should you perform? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set the operation route type as Standard.

B.

Set the input warehouse on the resource to the vendor warehouse.

C.

Set the operation route type as Vendor.

D.

Set all BOM lines warehouse to the production warehouse.

E.

Set all the BOM lines to resource consumption.

Question 26

You need to set up the configuration model to price the motorcycles correctly. What should you do?

Options:

A.

Set Order type in price model to Sales Order and Pricing method in Version to Attribute based

B.

Set Order type in price model to Sales Order and Pricing method in Version to Cost based.

C.

Set Order type in price model to Sales Quotation and Pricing method in Version to Attribute based.

D.

Set Order type in price model to Sales Quotation and Pricing method in Version to Cost based

Question 27

You need to set up the system to calculate the overhead rates automatically for production.

Which four actions should you perform in sequence? To answer, move the appropriate actions from the list of actions to the answer area and arrange them in the correct order.

Options:

Question 28

STION NO: 1

You need to create the constraint for the ML seat selection.

Which expression constraint should you use?

Options:

A.

Implies[Trim==Legend,Seat==ML]

B.

Seat!=ML

C.

[Trim==Legend|Seat==ML]

D.

Implies[Seat==ML,Trim==Legend]

Question 29

You need to configure the system for plastic operations.

Which two parts should be manually reported as finished? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

unmachined plastic pieces

B.

mold tooling

C.

machined plastic pieces

D.

excess plastic

Question 30

You need to configure each item for plastic manufacturing.

Which production types should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 31

You need to configure scheduling for each production area.

Which scheduling options should you use? To answer, select the appropriate option in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 32

You need to modify the production order defaults for the manufacturing execution production order Start process.

What should you do? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 33

You need to configure the solution for the two issues the production manager reported.

How should you complete the configurations? To answer, move the appropriate configurations to the correct issues. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Question 34

You need to configure the production requirements of the controller.

What should you configure? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Question 35

You need to configure the two lift kit subassembly cost requirements for production.

Which methods should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 36

You need to resolve the issue reported by Buyer1.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Assign new engineering version for parent BOM.

B.

Enable active for planning for lifecycle status.

C.

Assign lifecycle state for parent BOM.

D.

Disable active for planning for lifecycle status.

E.

Assign lifecycle state for subassembly.

Question 37

You need to configure the controller's ModelB asset requirements for the off-season.

What should you do?

Options:

A.

Use the default functional location

B.

Create a functional location.

C.

Create a location profile.

D.

Create a location type.

Question 38

You need to configure the reservation methods prototype production order as planned by the engineering team.

How should you configure the prototype production order? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to move the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Question 39

You need to resolve the ModelT issue reported by the golf course manager.

Which two features should you configure? Each correct answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Service subscription

B.

Counter-based maintenance plan lines

C.

Maintenance plan lines for the location

D.

Service type item

E.

Time-based maintenance plan lines

Question 40

You need to configure the warehouse manager's ModelA subassembly production requirements. Which setting should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 41

You need to enable the features and configuration keys for the firepits.

Which two features should you enable? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point

Options:

A.

Engineering attributes

B.

Change management for process manufacturing

C.

Engineering product variants

D.

Engineering change management

E.

Production floor execution management

Question 42

You need to configure the requirements for metal fabrication equipment maintenance. What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 43

You need to meet the needs for the large teakwood furniture order.

What must you configure? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

Options:

Question 44

You must ensure that the firepit product is available for sale. How should the product be released?

Options:

A.

Release the engineering product version and then assign the route.

B.

Connect the BOM to an engineering product version before release.

C.

Connect a route to an engineering version before release.

D.

Release the engineering product version and then assign BOM.

Question 45

You need to meet the requirements for User2.

What should you configure?

Options:

A.

Process over/under transactions.

B.

Create a transfer journal.

C.

Cancel the product receipt.

D.

Correct the product receipt.

E.

Create a movement journal.

Question 46

You need to meet the substitution requirements for User4 and User5.

What must you configure? To answer, drag the appropriate configurations to the correct substitution requirements. Each configuration may be used once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

Options:

Question 47

You need to address the ignition switch issue.

Which three actions should you perform? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point.

Options:

A.

Set product readiness to manual,

B.

Copy link and products.

C.

Define business impact.

D.

Change product lifecycle state.

E.

Set product readiness to automatic.

Page: 1 / 18