Winter Special Flat 65% Limited Time Discount offer - Ends in 0d 00h 00m 00s - Coupon code: netdisc

Oracle 1z0-1075-24 Oracle Manufacturing Cloud 2024 Implementation Professional Exam Practice Test

Page: 1 / 5
Total 50 questions

Oracle Manufacturing Cloud 2024 Implementation Professional Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$42  $119.99

PDF Study Guide

  • Product Type: PDF Study Guide
$36.75  $104.99
Question 1

In a Manufacturing Cloud implementation, users are finding it difficult to track information about work orders executed across various work centers.

Which three information types in the Work Order Traveler can help users in this situation?

Options:

A.

Reservation against sales orders

B.

Hard pegging of items

C.

Item on-hand quantity

D.

Work definition details

E.

Product serial Information

Question 2

Your client needs to implement operational checks for compliance with training and job requirements. Which four statements are true about this functionality?

Options:

A.

A qualified operator need not be specified to report resource transactions.

B.

You have the ability to associate a Job profile with a Work definition operation resource.

C.

The qualification Is enforced during reporting of labor usage.

D.

You have the ability to associate a Job profile with a Standard operation resource.

E.

You do not have the ability to associate a Job profile with a Work order operation resource.

F.

The qualification Is used to warn a production supervisor If they assign operators that don't meet the skill requirements against the resource.

Question 3

A manufacturing plant has two shifts of eight hours each for the work center WCI: day shift and night shift. You associate four units each of the resources R1, R2, R3, and R4 to WCI. The customer wants to assign ail units of R2 available for day and night shift.

What is the correct sequence of steps to achieve this?

Options:

A.

Associate R2 with WC1 > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter 4in the Day Shift column > Enter 4 In the Night Shift column.

B.

Associate R2 with WC1> Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter 4in the Day Shift column > Enter 4 In the Night Shift column.

C.

Associate R2 with WCI > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter 2 in the Day Shift column > Enter 2 in the Night Shift column.

D.

Associate R2 with WCI > Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter 2 In the Day Shift column > Enter 2 In the Night Shift column.

Question 4

You are defining a standard operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.

Which setup task must you perform to achieve this?

Options:

A.

Deselect the Count Point check box while defining the standard operation.

B.

Select the Automatically Transact check box while defining the standard operation.

C.

Select the Count Point check box while defining the standard operation.

D.

Ensure that the Charge Type of the resource is Automatic.

Question 5

A manufacturing plant works in two shifts of eight hours each. A Manufacturing user wants four units of a work center resource, R1, to be available during nonworking time, outside the regular shift on a particularday.

Which is the correct sequence of steps to create a resource exception on the Manage Work Center Resource Calendar page?

Options:

A.

Click Inside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource dropdown list > Enter 4 in Default Units Available.

B.

Click inside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration Fields > Go to the Resource Availability region > Populate A units in the Default Availability column.

C.

Click outside the existing shift time on a specific date > Go to the Actions menu > Select Create Resource Exception > Populate the Start and Duration fields > Go to the Resource Availability and Overrides region > Populate 4 units in the Availability Override column.

D.

Click outside the existing shift time on a specific date > Go to the Create Work Center page > Click the Resource Availability tab > Click the Add icon > Select R1 from the Resource drop-

Question 6

Which statement is NOT true about user-defined work order statuses?

Options:

A.

The system automatically updates user-defined work order statuses.

B.

They are displayed on work order reports.

C.

It is not recommended to update the name of the system status.

D.

All the new statuses are searchable so you can filter your job and manage the work order life cycle more easily.

Question 7

The pick release of a project work order creates movement requests with the project and the task from the work order.

Which statement is NOT true about this?

Options:

A.

The expenditure type, expenditure date, and expenditure organization are derived when the work-ln-process material issue or work-in-process material pick transactions are interfaced to Costing.

B.

The expenditure type for the item is derived based on the Default Expenditure Type attribute in Inventory Management. The picks for the work order ore grouped by project costing, project, and task using pick slip grouping rules.

C.

The expenditure type and the expenditure organization from the work order are referenced onto the shop floor movement requests.

D.

The expenditure type and the expenditure organization from the work order are not referenced onto the shop floor movement requests.

Question 8

Which three actions can a supervisor perform to annul or correct mistakes in a completed work order, committed by a user while entering work order details?

Options:

A.

Reverse a Closed order to Open.

B.

Correct the Product entered at work order.

C.

Reverse from Scrap to Ready.

D.

Reverse at an operation.

E.

Reverse the product at the last operation.

Question 9

Which three statements are true about the main areas of Managerial Accounting?

Options:

A.

Receipt Accounting Is the application that performs accrual accounting for all types of receipts.

B.

Landed Cost Management gives organizations financial visibility into their extended supply chain costs.

C.

Supply Chain Orchestration automatically selects the correct process based on user-defined Subledger Accounting rules when a supply creation Is initiated.

D.

Cost method can be defined with granularity down to individual Items.

Question 10

A Production Operator needs to load work order operation transactions from an external system into Manufacturing Cloud.

What is the correct sequence of tasks to achieve this?

Options:

A.

Export file to UCM server > Load data to data repository > Process import operations transactions > Load file from UCM to interface table.

B.

Load data to data repository > Load file from UCM to interface table > Export file to UCM server > Process import operations transactions.

C.

Load data to data repository > Export file to UCM server > Process import operations transactions > Load file from UCM to Interface table.

D.

Load data to data repository > Export file to UCM server > Load file from UCM to interface table > Process import operations transactions.

Question 11

Which three statements are true about managing Units of Measure?

Options:

A.

You must define the unit of measure class with a base unit of measure.

B.

If you want to transact items in units of measure that belong to classes other than their primary UOM class, you must define conversions between the base units of measure in different UOM classes.

C.

A unit of measure standard conversion specifies the conversion factor by which the unit of measure is equivalent to the unit of measure class.

D.

Conversions between classes are unique for each item; the conversion rate varies for intraclass units of measure.

E.

A unit of measure conversion is a mathematical relationship between two different units of measure.

Question 12

Which three statements are true about executing rework work orders with manual control?

Options:

A.

You can perform operation completion only after the assembly has been issued to the work order, and only up to the quantity that the assembly component item Is issued to the work order.

B.

You can cancel the work order after releasing it and after performing any transactions.

C.

You must manually issue the assembly item to rework a work order, either partial or full quantity.

D.

You cannot cancel the work order after releasing it or after performing any transactions.

E.

If the group has grouping attributes, only work orders that match the grouping attribute values can be assigned to the groups.

Question 13

To help ensure compliance with the US Code of Federal Regulations (21 CFR Part 11), your client wants to enable audit trail for manufacturing work definitions and standard operations.

Which is NOT included in the audit trail for standard operations such as creation, update, and deletion?

Options:

A.

Work definition header and version attributes

B.

Descriptive flexfields (OFFs) at any level

C.

Item structure component attributes referenced from Product Information Management(PIM)

D.

Attachments at any level

E.

Operation resources. Including alternate resources

Question 14

During a Manufacturing Cloud implementation, a Production Supervisor wants to close the work orders for the previous month and make sure that they include the correct cost.

What must they do to achieve this?

Options:

A.

Exclude cost variances while closing last month's work orders because those can be applied directly In Subledger Accounting.

B.

Make sure that all costs are Included while closing last month's work orders; however, variances can be Included after closing the work orders.

C.

Include all costs and variances in last month's work orders and close them; however, the work orders where updates are expected must not be closed.

D.

Update work order costs at any time; they can be updated regardless of the status of the workorder

Question 15

A Production Operator is executing a work order at your plant. After completing move transactions, they notice that they have performed some incorrect move operations, including incorrect scrap and reject transactions.

They must perform a reverse transaction to correct the errors. The operations are not count point-enabled and not auto-charged.

Which four transactions are required to correct this situation?

Options:

A.

Reverse material issued to a work order.

B.

Reverse at an operation.

C.

Reverse from Scrap to Ready.

D.

Reverse from Reject to Ready.

E.

Reverse the product at the last operation.

F.

Reverse resources charged to a work order.

Page: 1 / 5
Total 50 questions