After setting up Start My Day, the end user makes some changes in the Manage Applications window to prioritize and manage the applications configured to launch using the Start My Day functionality.
Which of the following applications does the user see on the desktop after using the Start My Day functionality?
During project testing, an issue requires you to add a diagnostic log component to track the log files to help determine a resolution. After testing, you decide not to remove the diagnostic log component from the automation and decide to simply turn off the log component.
Which diagnostic log component setting allows you to turn the logging component off temporarily?
A project requirement is to run the solution in multiple environments: Development and Production.
Which two items can be added to the two Project Configuration files? (Choose two.)
Lines in the RuntimeLog containing the text “ExecutionLink From:” refer specifically to what item from your solution?
There are two basic types of automations: events and procedures.
Which three statements describe a procedure automation? (Choose three.)
In the Answer Area, drag each use case on the left to the correct Toolbox item.
You have extracted a proxy for a data set and are using it to pass the data into a procedure automation input parameter. In the procedure automation, the data link from the input parameter is not connecting to the stringValue on a stringUtils method.
What two troubleshooting steps do you perform to correct the issue? (Choose two.)
Which of the following controls cannot be added to the Windows form?
Which two statements about Label/Jump To functionality are true? (Choose two.)