New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70special

SAP C_S43_2023 SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management Exam Practice Test

Page: 1 / 8
Total 80 questions

SAP Certified Associate - SAP S/4HANA Cloud Private Edition Asset Management Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$37.5  $124.99

PDF Study Guide

  • Product Type: PDF Study Guide
$33  $109.99
Question 1

Which of these are necessary steps of the Inspection Checklist process? Note: There are 2 correct answers to this question

Options:

A.

Generate Inspection Lols within the checklists view.

B.

Link PM task list with assigned inspection point type to a maintenance item.

C.

Record the usage decision for an Inspection Lot

D.

Generate Inspection Lots assigned to maintenance order headers.

Question 2

Which views can you assign to an equipment category via a view profile? Note: There are 2 correct answers to this question?

Options:

A.

Warranty

B.

Configuration

C.

Serial data

D.

Manufacturer data

Question 3

You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question

Options:

A.

Assign the header material of a material BOM as assembly to a task list operation.

B.

Assign the BOM usage for free assignment of material in Customizing

C.

Assign the header material of a material ROM to the assembly field of the task list header

D.

Assign a piece of equipment with allocated material BOM to a task list operation.

Question 4

You want to set up a general maintenance task list for inspection rounds using the overall time confirmation as a simplified way to record measurement documents. What do you need to do? Note: There are 2 correct answers to this question

Options:

A.

Assign a measuring point as a production resources/tools (PRT) to a task list operation.

B.

Assign a piece of equipment with an allocated measuring point to a task list operation

C.

Assign an inspection lot to the task list header

D.

Assign an inspection document as a PRT to the task list operation.

Question 5

How is Phase-based Maintenance Processing activated in the SAP system? Note: There are 2 correct answers to this question

Options:

A.

Through Best Practices scope items 4HH and 4HI.

B.

Phase-based maintenance is always active in all S/4HANA 2021 editions and above

C.

By installing the corresponding enhancement pack and activating the related business function

D.

By manually activating the corresponding Business Feature in case Best Practices are not used.

Question 6

What are valid item categories for a BOM used in Asset Management? Note: There are 3 correct answers to this question.

Options:

A.

D (Document item)

B.

I (PM Structure element)

C.

F (Functional location)

D.

L (Stock item)

E.

E (Equipment)

Question 7

Which functions characterize a Strategic analysis as opposed to embedded analysis within the SAP S/4HANA core system? Note: There are 2 correct answers to this question

Options:

A.

Preconfigured Core Data Service (CDS) containing SQL views

B.

A collection of tools that are not included with core SAP S/4HANA

C.

SAP Business Objects as a part of SAP Business Warehouse (BW)

D.

SAP Business Objects Business Intelligence for Visualization

Question 8

You are analyzing the data transfer of the cost center of a piece of equipment. What are the possible data origins? Note: There are 2 correct answers to this question

Options:

A.

The individual maintenance of the cost center in the equipment master record

B.

The reference functional location of the superior functional location

C.

The cost center of the superior equipment

D.

The cost center of the related maintenance work center

Question 9

Which operations are possible when you cancel the technical completion of a maintenance order? Note: There are 2 correct answers to this question

Options:

A.

Cancel status Released.

B.

Change the pronty

C.

Book a goods receipt.

D.

Change the estimated costs.

Question 10

The planner adds stock materials in the maintenance order. What are possible options for handling of reservations within a maintenance order? Note: There are 2 correct answers to this question

Options:

A.

Open reservations can be cleared when a maintenance order operation is finally confirmed.

B.

Reservations are created only after a material availability check has been performed

C.

For the combination of order type and planner group, you can decide when reservations are created

D.

All open reservations are closed when the maintenance order is set to TECO.

Question 11

A Task List contains two operations:

•Every 3 MON: pump inspection

•Every 24 MON. pump replacement

When replacing the pump, the operation pump inspection will be ignored. How can you achieve this?

Options:

A.

Assign different hierarchy levels

B.

Set the lead float

C.

Create a task list hierarchy

D.

Create a cycle set sequence

Question 12

Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question

Options:

A.

QM inspection plan with assigned inspection characteristics

B.

Inspection point type assigned to the task list header

C.

Master inspection characteristics assigned to PM task list operations

D.

Classification data assigned to a technical object

Question 13

Which of the below objects can you assign in a notification item? Note: There are 2 correct answers to this question

Options:

A.

Only one object part

B.

One or more causes of damage.

C.

Only one cause of damage

D.

One or more object parts

Question 14

You cancel the technical completion of a work order. What are the effects? Note: There are 2 correct answers to this question?

Options:

A.

Open reservations are recompiled.

B.

Open purchase requisitions are recompiled

C.

Referenced notifications are put in Process again.

D.

Open purchase orders are recompiled.

Question 15

What can be determined using the offset within a maintenance strategy? Note: There are 2 correct answers to this question.

Options:

A.

The first due date of a maintenance package

B.

A one-time shift of a maintenance package

C.

A preliminary buffer shifting the reference date of the maintenance order

D.

The call date for the maintenance order

Question 16

You settle a refurbishment order with the batches (valuation types) having price control standard price. What is the effect? Note. There are 2 correct answers to this question.

Options:

A.

The effective costs are posted as a credit memo to a price difference account

B.

The effective costs are posted to the respective batch (valuation type).

C.

The goods receipt for the batch refurbished is posted with the value of the standard price.

D.

The goods receipt for the batch refurbished is posted with the value of the moving average price

Question 17

What are mandatory characteristics of orders with Operation Account Assignment (OAA)? Note: There are 3 correct answers to this question

Options:

A.

Overall costs are dynamically summed up on the header level.

B.

A technical object must be assigned to an order operation

C.

Costs are stored only for the operation object

D.

Purchase requisitions have the operation as account assignment.

E.

The settlement rule is maintained on the header level.

Question 18

You want to set up a scenario for regular maintenance. The first event should take place after 1 year, after that, it is a regular cycle of 6 months. Which parameter do you have to use to map this in the system?

Options:

A.

Package hierarchy

B.

Scheduling indicator

C.

Maintenance package offset

D.

Cycle modification factor

Question 19

The maintenance technician wants to document work steps for a technical object in a notification. What are the best options to be used in regard to code-based reporting? Note: There are 2 correct answers to this question?

Options:

A.

A text in the subject long text screen

B.

An entry in the object list

C.

A task in the notification item

D.

An activity in the notification header

Question 20

Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?

Options:

A.

Technical objects

B.

Work orders and operations

C.

ESRI Maps

D.

Cost analytics

E.

Breakdown analytics

Question 21

You want to create a single-cycle plan with a cycle of 12 months. You use the scheduling indicator Time-key date. The orders should be called 3 months before the planned date.How can you set up the maintenance plan? Note: There are 2 correct answers to this question

Options:

A.

Set the call horizon to 25%.

B.

Set the call horizon to 75%

C.

Set the offset to 3 months

D.

Set the call horizon to 90 days.

Question 22

Which functions are available in the Resource Scheduling for Maintenance Planners app? Note: There are 2 correct answers to this question.

Options:

A.

Schedule and dispatch maintenance operations by shifts.

B.

Dispatch maintenance order operations

C.

Monitor maintenance order operations due in the next 4 weeks

D.

Print job papers from a maintenance order.

Question 23

What are the prerequisites for serializing a piece of equipment? Note: There are 3 correct answers to this question

Options:

A.

Add a serialized material to the equipment serial data view.

B.

Assign a serial number profile to an additional business view for equipment category

C.

Assign a serial number profile to the equipment category

D.

Assign a serial number profile to the related material master.

E.

Maintain a serial number for an existing equipment master.

Question 24

To which objects can a personnel number be directly assigned? Note: There are 2 correct answers to this question?

Options:

A.

Planner group

B.

Maintenance plan

C.

Work center

D.

Business partner

Page: 1 / 8
Total 80 questions