What type of time element can be reduced by strategy settings while dispatching?
What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?
If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?
Which time elements are relevant for lead time scheduling of a production order?
In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.
For which categories can you define BOMs in SAP S/4HANA?
What happens to this dependent requirement when you convert the planned order into a production order?
How can you achive a feasible production plan in case of capacity constraints?
Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?
Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?
When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?
Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?