New Year Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70special

SAP C_TS422_2021 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Exam Practice Test

SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$37.5  $124.99

PDF Study Guide

  • Product Type: PDF Study Guide
$33  $109.99
Question 1

What type of time element can be reduced by strategy settings while dispatching?

Options:

A.

Transportation time

B.

Wait time

C.

Queue time

D.

Setup time

Question 2

What detremines whatherthe planned independent requirements in MRP are consumed by other requrements?

Options:

A.

Consumption sequence procedure

B.

Requirements profile

C.

Order type

D.

Requirements type

Question 3

If the stock level drops below the reorder stock in reorder point planning, what logic would the system use to trigger procurement?

Options:

A.

Fill up based on the lot size procedure

B.

Fill up to the maximum stock level

C.

Fill up to the safety stoc level

D.

Fill up to the reorder stock level

Question 4

Which time elements are relevant for lead time scheduling of a production order?

Options:

A.

Float after production

B.

Planned delivery time

C.

Total replenishment lead time

D.

Setup time

Question 5

In the Capacity Scheduling Table, which settings can you select for the planning strategy? Note: There are 3 correct answers to this question.

Options:

A.

Planning mode

B.

Finiteness level

C.

Fixed pegging

D.

Direction

E.

Scheduling control

Question 6

For which categories can you define BOMs in SAP S/4HANA?

Options:

A.

Work Center

B.

Sales order

C.

Class

D.

Document Structure

Question 7

What happens to this dependent requirement when you convert the planned order into a production order?

Options:

A.

They are converted into a schedule line.

B.

They are converted into a reservation.

C.

They are converted into a production order.

D.

They are converted into a planned order.

Question 8

How can you achive a feasible production plan in case of capacity constraints?

Options:

A.

Select an alternative mode on a resource.

B.

Adjust the available capacity.

C.

Reduce the planning window

D.

Form optimum sequence to reduce setup times

E.

Execute an infinite production planning run

Question 9

Your client is asking for your advice on material master numbering in SAP S/4HANA. What do you need to consider?

Options:

A.

The maximum mater all number length is 40 for external numbers and 18 for internal numbers

B.

The number of leading zeros for internal numbers is client-specific.

C.

In Customizing you can decide by material type whether to use the long material number.

D.

The display template for material numbers applies to all clients.

Question 10

Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

Options:

A.

Planed delivery time

B.

Operation duration

C.

In-house production time

D.

Total replenishment lead time

Question 11

When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

Options:

A.

The cross-plant status

B.

The plant-specific status

C.

The last restrictive status

D.

The most restrictive status

Question 12

Your project used process orders for the production of liquid chemicals.

What can you define to ensure that the production flow happens only in physically connected tanks?

Options:

A.

Operation network

B.

Work center hierarchy

C.

Setup matrix

D.

Resource network