How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,
For a production version to be valid and consistent, what requirements must be fulfilled? Note:There are 3 correct answers to this question.
Which materials have a negative quantity in a bill of material or in a recipe?
Note: There are 3 correct answers to this question
Which of the following questions do you have to answer before you start creating a bill of material (BOM)?
Your production planners must execute planning only for specific resources. How can you achieve this in Advanced Planning (PP/DS)?
Which information is required when you create a product master in SAP S/4HANA?
Note: There are 2 correct answers to this question.
You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?
Your company produces a finished good based on a forecast and expects it to be in stock when customers order it. If customers order more than the forecasted quantity, this must NOT have any impact on the production program. Which planning strategy do you use?
Which standard item categories can you select inside a bill of material (BOM)?
Note: There are 2 correct answers to this question
What do you need to consider when working with material master numbering in SAP S/4HANA?
Note: There are 2 correct answers to this question.
How can a material availability check be triggered automatically for a production order?
Note: There are 2 correct answers to this question.
Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA.
Note: there are 2 correct answers to this question.
Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable and physically connected tanks? Note: There are 2 correct answers to this question.
How can you achieve a feasible production plan in case of capacity constraints? Note: There are 3 Correct answers to this question.
You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?
You want to set up a make-to-order planning scenario for a finished material. The bill of materialcontains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?
You want to create a production order. What methods can you use?
Note: There are 2 correct answers to this question.
What is the difference between co-products and by-products?
in your Plant, MRP is activated.
which options do you have to exclude a material from the MRP run?
Note: there are 2 correct answers to this question.
Where do you maintain the work center that represents the production line for repetitive manufacturing?
Note: There are 2 correct answers to this question
Which of the following processes lead to an entry in the MRP planning file?
Note: There are 3 correct answers to this question.
where does the system check master data selection settings during the creation of planned orders and production orders?
Note: There are 3 Correct answers to this question.
You are trying to create a production order and NO valid production version can be selected. What could be the reasons?
Note: There are 2 correct answers to this question.
What is the work center hierarchy in capacity planning?