Question 1

What are some SAP recommended guiding principles to achieve clean core operations? Note: There are 3 correct answers to this question.

Options:

A.

Establish an organizational structure technical foundation transformation methodology for clean core.

B.

Integrate clean core practices in the endtoend value process chain.

C.

Establish release management.

D.

Establish regular housekeeping tasks procedures.

E.

Define roles responsibilities as part of a process transformation office.

Question 2

You have maintained the parameters for simple discontinuation in the material master of a component.

Which business process will be affected if the available stock is zero the discontinuation date is in the past?

Options:

A.

Back flushing

B.

Kanban

C.

Material requirements planning

D.

Production order release

Question 3

Which time elements does MRP consider in backward scheduling to determine the basic dates for components from depender Note: There are 2 correct answers to this question.

Options:

A.

Planned delivery time

B.

Total replenishment lead time

C.

Operation duration

D.

Inhouse production time

Question 4

Your company manufactures materials whose characteristics differ for each manufacturing process.

Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track use this information in all areas of logistics?

Options:

A.

Process order management

B.

Engineering change management

C.

Quality management

D.

Batch management

Question 5

What data can you maintain in the subitems of a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

Quantity

B.

Status

C.

Installation point

D.

Scrap percentage

Question 6

Which of the following processes lead to an entry in the MRP planning file? Note: There are 2 correct answers to this question.

Options:

A.

Changing the delivery address in transportation management

B.

Changing the storage bin in warehouse management

C.

Changing the procurement type in the product master

D.

Changing the stock in inventory management

Question 7

What does forecasting in the dem planning cycle include? Note: There are 3 correct answers to this question.

Options:

A.

Oneoff events

B.

Past production planning quantities

C.

Past quotation quantities

D.

Market intelligence

E.

Past sales order quantities

Question 8

What are the advantages of collective orders? Note: There are 2 correct answers to this question.

Options:

A.

To perform availability checks across the entire collective order

B.

To coordinate orders in the planning board for a collective order

C.

To show the flow of batches across the entire collective order

D.

To post confirmations for the entire collective order

Question 9

You have a scheduling agreement with a vendor. You want classic MRP to automatically create schedule lines in case of material shortage. What must you do?

Note: There are 2 correct answers to this question.

Options:

A.

Set the creation indicator for purchase requisitions on the initial screen of the MRP run.

B.

Add the agreement to the source list mark it for MRP relevance.

C.

Set the creation indicator for delivery schedule lines on the initial screen of the MRP run.

D.

Add the agreement to the quota arrangement mark it for MRP relevance.

Question 10

For production orders cost object controlling (COC) can be carried out on an order related or product related basis. Which of the following do you have to consider?

Note: There are 2 correct answers to this question.

Options:

A.

Productrelated COC is used in manufacturing for coproducts.

B.

In productrelated COC all costs are debited credited to a product cost collector.

C.

In orderrelated COC individual production orders do NOT have cost segments.

D.

Orderrelated COC is beneficial in a flexible production environment.

Question 11

Under what circumstances can you change the material type for a material if stocks reservations or purchasing documents exist? Note: There are 2 correct answers to this question.

Options:

A.

The quantity value updates are the same.

B.

The same batch management level is used.

C.

The same base unit of measure is used.

D.

The same account category is used.

Question 12

Which time elements are relevant for lead time scheduling of a production order? Note: There are 2 correct answers to this question.

Options:

A.

Opening period

B.

Total replenishment lead time

C.

Float after production

D.

Setup time

Question 13

Your project uses process orders for the production of liquid chemicals.

What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.

Options:

A.

Resource hierarchy

B.

Resource selection

C.

Resource matrix

D.

Resource network

Question 14

Why would you use phantom assemblies?

Note: There are 3 correct answers to this question.

Options:

A.

To simplify the structure of bills of material

B.

To reduce the number of changes required in bills of material

C.

To reduce the number of material masters

D.

To make the assignment of components easier

E.

To increase the number of planning levels

Question 15

What determines whether the planned independent requirements in dem management are consumed by other requirements? Note: There are 2 correct answers to this question.

Options:

A.

Order type

B.

Requirements profile

C.

Requirements type

D.

Planning strategy

Question 16

What are the key features of using a low level code? Note: There are 2 correct answers to this question.

Options:

A.

To determine the priority of alternative components inside ATP

B.

To determine how costs are rolled up by product costing

C.

To determine the sequence in which materials are planned in MRP

D.

To determine the use of subitems inside material BOM (bill of material)

Question 17

What does a line hierarchy in repetitive manufacturing represent?

Options:

A.

A production line with more than one work center

B.

A production line with an alternative sequence in the routing

C.

A production line with a parallel sequence in the routing

D.

A production line with prioritized alternative work centers

Question 18

How can a material availability check be triggered automatically for a production order? Note: There are 2 correct answers to this question.

Options:

A.

By capacity planning

B.

By order confirmation

C.

By order release

D.

By mass processing

Question 19

Mode selection is one of the scheduling options available with Advanced Planning in SAP S/4HANA Cloud Private Edition. When can you use mode selection?

Options:

A.

When several operations are maintained for one product

B.

When alternative resources are used within one operation

C.

When several production versions are maintained for one product

D.

When multiple planned orders are scheduled in parallel on one resource

Question 20

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

Options:

A.

First in first out (FIFO)

B.

Simultaneous

C.

Manual maintenance

D.

100% check

Question 21

Your quality department detects a deviation in a raw material batch. Unfortunately this batch has already been used in production. How can you identify all affected finished goods stocks?

Note: There are 2 correct answers to this question.

Options:

A.

Use batch determination.

B.

Use the Batch Information Cockpit.

C.

Use the batch whereused list.

D.

Use batch derivation.

Question 22

Which master data fields can have an impact on whether MRP creates planned orders or purchase requisitions for a material? Note: There are 2 correct answers to this question.

Options:

A.

Procurement type

B.

Material type

C.

MRP type

D.

MRP group

Question 23

How would you define pegging in the context of Advanced Planning?

Options:

A.

An evaluation that is ordered according to the billofmaterial structure of all related products represents the relationship between the receipt the issue elements

B.

An evaluation to identify overstock situations in the balance between the receipt the issue elements after the production planning run

C.

An evaluation that is ordered according to the network structure of all related products represents the coverage of issue elements with receipt elements stock

D.

An evaluation to identify material or capacity shortages in the billofmaterial structure after the production planning run

Question 24

Which of the following questions do you have to answer before you start creating a bill of material (BOM)? Note: There are 2 correct answers to this question.

Options:

A.

In which storage location is the BOM required?

B.

Is the material type allowed in the BOM?

C.

Which base unit of measure does the material have?

D.

What status does the BOM have?