Black Friday Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: 70special

SAP E_S4HCON2023 SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Exam Practice Test

SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade Questions and Answers

Testing Engine

  • Product Type: Testing Engine
$37.5  $124.99

PDF Study Guide

  • Product Type: PDF Study Guide
$33  $109.99
Question 1

In which case can you use near-Zero Downtime Maintenance (nZDM)? Note: There are 2 correct answers to this question.

Options:

A.

When performing an SAP S/4HANA conversion with DMO

B.

When performing an SAP S/4HANA conversion without u DMO

C.

When upgrading an SAP S/4HANA Server system

D.

When upgrading an SAP ECC system with DMO

Question 2

You are planning to use DMO of SUM to perform an "inplace-migration" to SAP HANA. What do you need to consider? Note: there are 2 correct answers to this question.

Options:

A.

The source system is non-Unicode and the target database is a scale-out system.

B.

The target database size increases temporarily because of the Shadow Repository.

C.

SAP HANA Landscape Reorganization required a manual step to edit a file.

D.

Network capacity between exporting and importing R3load processes must be.

E.

Unicode conversion is part of DMO only in case of target version AS ABAP 7.40 or 7.31.

Question 3

You are performing an inplace SAP S/4HANA conversion including DMO. What is the latest point in time when you can reset the procedure without losing data?

Options:

A.

The start of the Execution roadmap step

B.

The start of the business downtime

C.

The end of the business downtime

D.

The end of the database migration

Question 4

You are performing an S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of dictionary objects (SPDD)?

Please choose the correct answer.

Response:

Options:

A.

Credentials of a named user in client 000 of the shadow system

B.

Credentials of a named user in the development client of the development system

C.

Credentials of user DDIC in client 000 of the shadow system

D.

Credentials of user DDIC in the development client of the development system

Question 5

Which maintenance events are possible with SUM for an SAP system based on AS ABAP 7.40 and above? There are 3 correct answers to this question.

Options:

A.

Dual Stack split

B.

Support Package Stack update

C.

Database migration

D.

Release upgrade

E.

Homogenous system copy

Question 6

You are performing an upgrade with SUM. You are in the BIND_PATCH phase of the roadmap step "Configuration". For some software components you find entries in the "Calculated level" column.

What does the "Calculated level" indicate for those software components?

Please choose the correct answer.

Response:

Options:

A.

The SAP Support Packages that will be bound to the upgrade

B.

The SAP Support Packages contained in the upgrade media

C.

The SAP Support Packages found in the download directory

D.

The SAP Support packages of the Support Package Stack, calculated by the Maintenance Planner

Question 7

ICNV initialization does 3

Options:

A.

Creation of views

B.

AA

C.

Creation of flag

D.

Build index on flag column

Question 8

You are performing an SAP S/4HANA conversion of the development system. Which credentials do you use in which system to perform the adjustment of programs and other non-dictionary repository objects (SPAU)?

Please choose the correct answer.

Options:

A.

Credentials of a named user in client 000 of the shadow system

B.

Credentials of a named user in the development client of the development system

C.

Credentials of user DDIC in client 000 of the shadow system

D.

Credentials of user DDIC in the development client of the development system

Question 9

When using the DMO of SUM, which files can be handled by SUM in the download directory?

There are 2 correct answers to this question.

Response:

Options:

A.

Parameter file SAPup_add.par

B.

Stack XML file calculated by the Maintenance Planner

C.

Breakpoint configuration file SAPUPPHAS.BRK

D.

MIGRATE J5T_DUR_XML file from a previous run

Question 10

Which of the following are valid options to check the progress of an inplace SUM DMO run? Note There are 2 correct answers to this question

Options:

A.

Check the dump size of the database export on disk.

B.

Check the Charts Control Center in the SUM Ul

C.

Check logs for jobs starting with RSUPG_SGEN in the SAP system.

D.

Check the log files written in the SUM directory subdirectory abap. subdirectory log

Question 11

You are planning an SAP S/4HANA conversion.

Which conversion-specific tasks must be performed during the preparation phase?

Options:

A.

Check the compatibility of custom code with SAP S/4HANA.

B.

Run the database migration to the SAP HANA database.

C.

Solve problems from the simplification item (SI) checks.

D.

Perform the migration of data to the new data structure.

Question 12

You are performing an SAP S/4HANA conversion with DMO. You are using the downtime-optimized data conversion (DoC). Which steps can partially be moved to uptime processing? Note: There are 2 correct answers to this question.

Options:

A.

Software update

B.

Conversion

C.

Main import

D.

Migration

Question 13

You are planning an SAP S/4HANA conversion. Which conversion-specific tasks need to be performed during the preparation phase?

There are 2 correct answers to this question.

Response:

Options:

A.

Run the database migration to the SAP HANA database

B.

Perform the migration of data into the new data structure

C.

Check the compatibility of custom code with SAP S/4HANA

D.

Apply the recommendations of the simplification list

Question 14

You are performing an SAP S/4HANA conversion. You are in the BIND_PATCH phase of the Configuration roadmap step. For some software components, you find entries in the Calculated level column. What does the Calculated level indicate for those software components?

Options:

A.

The SAP support packages that will be bound to the conversion

B.

The SAP support packages contained in the upgrade media, calculated by the maintenance planner

C.

The SAP support packages of the support package stack, calculated by the maintenance planner

D.

The SAP support packages in the download directory that are newer than the selected support package stack

Question 15

What SAP systems can you use for the ABAP Test Cockpit (ATC) to perform the custom code analysis for an SAP S/4HANA conversion? Note: There are 2 correct answers to this question.

Options:

A.

Standalone AS ABAP with SAP_BASIS 752 and above

B.

SAP ECC system from SAP ERP 6.0 EHP 8

C.

SAP Solution Manager 7.2

D.

SAP S/4HANA Server 1809 and above

Question 16

Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.

Options:

A.

SAP S/4HANA conversion including DMO

B.

Prerequisite check

C.

DMO without system update

D.

SAP S/4HANA conversion without DMO

E.

Benchmark tool

Question 17

You are performing an SAP S/4HANA conversion. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question

Options:

A.

PARMVNT_UPG

B.

TABIMJJPG

C.

PARDIST_SHD

D.

TABIM_SHADOW_*

Question 18

You are performing an upgrade with SUM using DMO to an AS ABAP 7.50 based SAP system. You entered a specific number of R3Ioad processes during Roadmap step "Extraction".

Where can you change this during the migration via the Utilities option of the SUM UI?

There are 2 correct answers to this question

Response:

Options:

A.

In SUM Phaselist

B.

In Process Control Center

C.

In SUM Parameters

D.

In DMO Migration Preparation

Question 19

Which are valid options to check the progress of the database migration in a Microsoft Windows environment?

There is correct answers to this question.

Response:

Options:

A.

Check the "Charts Control Center" in the SUM UI

B.

Check logs for jobs starting with "RSUPG_SGEN" in the system

C.

Check the log files written under "SUM\abap\log"

D.

Check the dump size of the database export on disk

Question 20

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

Options:

A.

Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration

B.

Unicode conversion SAP S/4HANA conversion including database migration

C.

Unicode conversion SAP S/4HANA conversion without database migration Database migration

D.

SAP S/4HANA conversion including database migration and Unicode conversion

E.

Unicode conversion Database migration SAP S/4HANA conversion without database migration

Question 21

You are executing a standard SUM procedure to update an SAP system using main configuration mode "Standard". When will the shadow system be stopped for the last time?

Please choose the correct answer.

Response:

Options:

A.

Before the downtime starts

B.

At the end of the downtime

C.

As part of the cleanup process

D.

Early in the downtime

Question 22

What can you achieve by setting the SUM parameter "migration_only" to 1 in parameter file SAPup_add.par?

Please choose the correct answer.

Response:

Options:

A.

An upgrade of the software components is performed, without changing the database type.

B.

A change of the database type is performed, without changing the software components.

C.

An SAP S/4HANA conversion is performed, without adapting the customer data.

D.

A migration of the SAP system to a new hardware is performed, without performing an SAP S/4HANA conversion.

Question 23

You have selected "Standard" as scenario strategy in the SUM tool. Which steps take place via the shadow instance? Note: There are 2 correct answers to this question.

Options:

A.

Modification adjustment (SPAU)

B.

Modification adjustment (SPDD)

C.

Activation of dictionary objects (ACT_UPG)

D.

Conversion of application tables (PARCONV_UPG)