Question 1

Which of the following standards needs to be followed to comply with Indoor Environmental Quality Credit, Thermal Comfort?

Options:

A.

ASHRAE 55-2010

B.

ASHRAE 62.1-2010

C.

ASHRAE 90.1-2010

D.

ASHRAE 189.1-2010

Question 2

Which of the following is a source reduction strategy to eliminate waste produced by a project?

Options:

A.

Design-build

B.

Prefabrication

C.

Custom design

D.

Material science

Question 3

Which of the following products must always be included in Materials and Resources credits?

Options:

A.

Faucets

B.

Furniture

C.

Interior Paint

D.

Fire suppression system

Question 4

During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highly reflective roof. Which option should the LEED AP recommend to best address these concerns?

Options:

A.

Install a vegetative roofing system

B.

Change the design to reduce the amount of roofing area

C.

Change the roofing material to a dark material to eliminate the issue

D.

Increase the parapet height

Question 5

A school wants to incorporate natural daylighting in classrooms on all sides of the building. What can the project design team explain to the school district about how this strategy will affect the operational energy cost?

Options:

A.

Heat gain will reduce the air conditioning load

B.

Having the lights off reduces the electricity use

C.

Reduction in lighting fixture use reduces re-lamping

D.

There would be passive solar heating benefits to all of the classrooms

Question 6

The LEED AP is leading the first design charrette for a new LEED project with the project's owners. What document should be used to record the project goals to be used throughout the design of the project?

Options:

A.

Owner's Project Requirements (OPR)

B.

Owner's list of wants and needs

C.

Criteria for contractor selection

D.

Basis of Design (BOD)

Question 7

How can a building owner promote both energy efficiency and thermal comfort in a building?

Options:

A.

Survey occupants about their comfort on a regular basis

B.

Provide occupants with individual space heaters in the winter

C.

Ask the cleaning contractor to turn off all of the lights after cleaning

D.

Institute a flexible dress code that permits seasonally appropriate clothing

Question 8

Which federal agency designates Federal Renewal Community sites, which can be considered High Priority Sites for

project development?

Options:

A.

U.S. Internal Revenue Service

B.

U.S. Department of Agriculture

C.

U.S. Environmental Protection Agency

D.

U.S. Department of Housing and Urban Development

Question 9

A project team has installed a rainwater harvesting system on site. In which of the following could this system be recognized?

Options:

A.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Indoor Water Use Reduction

B.

Water Efficiency Credit, Water Metering and Water Efficiency Prerequisite, Outdoor Water Use Reduction

C.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Credit, Indoor Water Use Reduction

D.

Sustainable Sites Credit, Rainwater Management and Water Efficiency Prerequisite, Indoor Water Use Reduction

Question 10

What is a viable strategy for optimizing open space under Sustainable Sites Credit, Open Space? U

Options:

A.

Coordinate open space features during the construction phase

B.

Minimize the floor-area ratio (FAR) and accessibility for open space

C.

Design a parking and road footprint layout that is not near open land

D.

Coordinate open space features early during the site planning phase

Question 11

Which of the following strategies would be considered an acceptable minor improvement within the wetland buffer for Location and Transportation Credit, Sensitive Land Protection?

Options:

A.

Build a two-story fitness facility

B.

Change the grade to install a security fence

C.

Provide a vehicular access drive that is less than 16 ft. (5 m) in width

D.

Remove trees that are less than 6 inches (15.24 cm) diameter at breast height

Question 12

What standard should an engineer use when establishing minimum ventilation rates for a new mechanically ventilated space to earn Indoor Environmental Quality, Minimum Indoor Air Quality Performance?

Options:

A.

Local building code

B.

ASHRAE 62.1-2010

C.

International Mechanical Code 2012

D.

The ventilation code requiring the greatest volume of outside air

Question 13

The Solar Reflectance Index (SRI) includes the measure of a material's

Options:

A.

color (shade of gray)

B.

ability to reflect solar radiation

C.

ability to absorb solar radiation

D.

ability to reflect thermal radiation

Question 14

What supporting material is required for all LEED Building Design and Construction projects in order to document Location and Transportation Credit, Bicycle Facilities for the bicycle network?

Options:

A.

Photographs of bicycle network signage and directional signposts

B.

Photographs of the installed bicycle storage and shower facilities

C.

Vicinity map showing bicycle network, route and distance along network to eligible destination(s)

D.

Manufacturer specifications for the chosen bicycle storage facilities, including the number of bicycles supported by each bike rack

Question 15

In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?

Options:

A.

Wall

B.

Steel

C.

Glass

D.

Concrete

Question 16

What LEED Building Design and Construction rating system mandates a preliminary LEED meeting with the principal members of the project team to create a LEED action plan that includes the anticipated certification tier, targeted credits and parties responsible for each credit?

Options:

A.

Healthcare

B.

Schools

C.

Data centers

D.

Hospitality

Question 17

What are the Storage and Collection of Recyclables requirements for only Retail projects under the Materials and Resources Prerequisite?

Options:

A.

Retail projects must conduct a waste stream audit for the duration of the project in an existing location or make projections based on historical data for similar establishments. Identify the top-five recyclable waste streams while stating the top-four waste streams where both collection and storage space will be provided

B.

Retail projects must conduct a waste stream audit once a month for the project in an existing or rented location or make projections based on data gathered from a previous cycle. Identify the top-three recyclable waste streams while stating the top-two waste streams where both collection and storage space will be provided

C.

Retail projects must conduct a waste stream audit twice a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

D.

Retail projects must conduct a waste stream audit for the once a year for the project in an existing or rented location or make projections based on the previous year's data for their business. Identify the top-four recyclable waste streams while stating the top-three waste streams where both collection and storage space will be provided

Question 18

When the project occupancy is not known, which method is recommended?

Options:

A.

Default occupant density from ASHRAE 62.1-2010, Table 6-1

B.

Default occupant density from ASHRAE 90.1-2010, Table G3.1.1A

C.

Weekly average taken into account all the occupants in a typical 24-hour day of operation

D.

Occupancy measured for eight hours, between 8 a.m. and 5 p.m., for all occupancy patterns

Question 19

Under the Building Design and Construction rating systems, projects can opt for a review process that helps teams determine if the project is on track to achieve LEED certification at its preferred level. This process is referred to as

Options:

A.

Split Review

B.

Appeal Review

C.

Expedited Review

D.

Credit Interpretation Ruling

Question 20

A project team reviews office chairs with a Type III environmental product declaration (EPD) for the five different categories of environmental impact reduction. Which of the following must the chairs demonstrate for product optimization?

Options:

A.

A reduction in at least two categories

B.

A reduction below the industry average in at least three categories

C.

A 5% reduction in all categories

D.

A 10% reduction in GHG emissions and a 10% reduction in at least two other categories

Question 21

Innovation credits for exemplary performance can be awarded for

Options:

A.

achieving one pilot credit

B.

achieving double the credit requirements

C.

demonstrating significant environmental benefits

D.

demonstrating a qualitative improvement in environmental performance

Question 22

Selecting a high-reflectance interior paint which is compliant with South Coast Air Quality Management District (SCAQMD) Rule 1113 can help contribute towards which two credits?

Options:

A.

Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Interior Lighting

B.

Indoor Environmental Quality Credit, Low-Emitting Materials and Sustainable Sites Credit, Site Assessment

C.

Indoor Environmental Quality Credit, Low-Emitting Materials and Indoor Environmental Quality Credit, Minimum Indoor Environmental Quality Performance

D.

Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies and Indoor Environmental Quality Prerequisite, Minimum Indoor Environmental Quality Performance

Question 23

A project's total site area is 240,000 ft2 (22 297 m2) and the building footprint is 40,000 ft2 (3 716 m2). How much

outdoor space and vegetated space must it provide to earn Sustainable Sites Credit, Open Space?

Options:

A.

60,000 ft2 (5 574 m2) of outdoor space of which 15,000 ft2 (1 394 m2) must be vegetated

B.

60,000 ft2 (5 574 m2) of outdoor space of which 50,000 ft2 (4 645 m2) must be vegetated

C.

72,000 ft2 (6 689 m2) of outdoor space of which 18,000 ft2 (1 672 m2) must be vegetated

D.

72,000 ft2 (6 689 m2) of outdoor space of which 60,000 ft2 (5 574 m2) must be vegetated

Question 24

Which of the following strategies can be used to achieve a point in Innovation Credit, Innovation, Option 1.Innovation?

Options:

A.

Achieve 60% reduction in outdoor water use

B.

Implement an employee engagement and education plan

C.

Use on site renewable energy for 8% of the total energy needs

D.

Purchase green power for 100% of the total project energy use

Question 25

A mixed-use development is located 1/2 mi. (0.80 km) from a future commuter rail line station. Which of the following pieces of information is needed when determining whether the rail line station can contribute to Location and Transportation Credit, Access to Quality Transit?

Options:

A.

Discounted rail pass availability

B.

Rail line station construction completion date

C.

Connections to transfer routes

D.

Passenger capacity

Question 26

A project team is attempting Location and Transportation Credit: High Priority Site and selects Option 1: Historic District. To demonstrate that the project is located in an infill site, the project team must confirm that:

Options:

A.

At least 75% of qualifying land areas within 3/4 mile (1.20 km) are previously developed

B.

At least 75% of qualifying land areas within 1/2 mile (0.80 km) are previously developed

C.

The project is a Federal Renewal Community site

D.

The site is a brownfield as defined by the Environmental Protection Agency

Question 27

The LEED AP has identified a pilot credit that is relevant to the project. This would be documented in LEED Online as a(n)

Options:

A.

Exemplary Performance for a related credit

B.

Special Circumstances within a related credit

C.

Regional Priority Credit

D.

Innovation Credit

Question 28

Which approach will contribute to maintaining compliance with Sustainable Sites Credit, Rainwater Management?

Options:

A.

Installing bioretention area

B.

Installing on-site renewable power generation facility

C.

Substituting impervious surface area with high-albedo paving materials

D.

Increase artificial turf on the roof

Question 29

The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following materials on the documentation contribute towards the credit?

Options:

A.

Excavated soil

B.

Wood derived fuel

C.

Items sent to the local incinerator

D.

Alternate Daily Cover

Question 30

When the LEED AP is applying the Integrative Process to a Building Design and Construction project, which of the following information is required to be present in the Owner's Project Requirements (OPR)?

Options:

A.

All applicable codes and standards

B.

Interior finishes related to the project

C.

All project team members and applicable roles

D.

Energy efficiency goals and training requirements

Question 31

Which of the following groups of documents is most likely to support both Indoor Environmental Quality Credit,

Thermal Comfort, and Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?

Options:

A.

Architectural floor plans, mechanical plans, lighting plans

B.

Photometric plans, mechanical schedules, lamp specifications

C.

Lighting plans, surveys of occupants, sequence of operations

D.

Surveys of occupants, photometric plans, mechanical schedules

Question 32

Which of the following plumbing fixtures apply to the calculations in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Toilets, urinals, pre-rinse spray valves

B.

Toilets, private lavatory faucets, dishwashers

C.

Urinals, public lavatory faucets, kitchen sink faucets

D.

Urinals, showerheads, commercial kitchen filling operations faucets

Question 33

Based on the results of a six-hour waste stream study, the project team for a retail project plans to provide dedicated areas for four easily recyclable waste streams: cardboard, plastic, metal and paper. The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite,

Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Question 34

A project team develops a site plan for a school project with an athletic field and a playground with real grass. In order to qualify for the Water Efficiency Prerequisite, Outdoor Water Use Reduction, the landscape area calculations:

Options:

A.

Must include the athletic field and playground

B.

May include the playground but must exclude the athletic field

C.

Must include the playground but exclude the athletic field

D.

May include or exclude the athletic field and the playground

Question 35

A commercial new construction project consists of mixed space usage. When deciding which LEED rating system to use, the LEED AP should follow which of the following rules?

Options:

A.

If a rating system is appropriate for less than 50% of the gross area of the LEED project space then the rating system must not be used

B.

If a rating system is appropriate for more than 50% of the gross floor area of LEED project space, then that rating system must be used

C.

If a rating system is appropriate for 30% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

D.

If a rating system is appropriate for 40% to 60% of the gross floor area, the project team must independently assess their situation and decide which rating system is most applicable

Question 36

How is the distance between the project site and the manufacturing location determined for Materials and Resources Credit. Building Disclosure and Optimization - Sourcing of Raw Materials. Option 2. Leadership Extraction Practices?

Options:

A.

Roadway distance

B.

Straight line distance

C.

Rail freight distance

D.

Air freight distance

Question 37

Which of the following strategies can be used to reduce the internal load of a building?

Options:

A.

Decreasing lighting power

B.

Oversize the HVAC systems

C.

Install low reflective exterior facade

D.

Increase the insulating value of the glazing and window frame system

Question 38

What document allows a LEED AP to register a project and sign the Certification Agreement?

Options:

A.

Owner Confirmation of Agent Authority

B.

Architect Code of Professional Conduct

C.

Commissioning (Cx) Agent Construction Permit

D.

LEED AP Standard Form of Agreement Between Owner and Architect

Question 39

A design team is pursuing Indoor Environmental Quality Credit, Indoor Air Quality Assessment. The building is 1,000 ft2 (93 m2) and has a 10 ft. (3 m) ceiling height. In order to earn the credit, what is the required volume of

supply air for the entire building flush-out?

Options:

A.

3,500,000 ft3 (99 108 m3)

B.

10,000,000 ft3 (283 168 m3)

C.

14,000,000 ft3 (396 435 m3)

D.

35,000,000 ft3 (991 089 m3)

Question 40

Which of the following transit modes is considered to be walkable if it is within 1/2 mile (0.8 km) of the functional entry of a project?

Options:

A.

Taxi stand

B.

Ferry terminal

C.

Local bus stop

D.

Streetcar stop

Question 41

A topographic assessment of a project site located 150 ft. (45 m) from a water body was conducted. The results of the slope analysis show that the site is generally sloping 6% to 8% to the northwest over most of the site, with some steep slopes located at the eastern edge of the property, which may impact the runoff volume. Which one of the following LEED credits or prerequisites will be affected by these results?

Options:

A.

Sustainable Sites Credit, Rainwater Management

B.

Sustainable Sites Prerequisite, Environmental Site Assessment

C.

Location and Transportation Credit, Sensitive Land Protection

D.

Location and Transportation Credit, High-Priority Site

Question 42

In Sustainable Sites Credit, Light Pollution Reduction, which factor is included in the lamp lumen uplight calculation?

Options:

A.

Total fixture power

B.

Site area of the project

C.

Quantity of installed luminaires

D.

Total fixture lumens below 90 degrees

Question 43

A project attempting to meet the preferred parking requirements for Location and Transportation Credit, Green Vehicles may provide what incentive to meet the requirements and highlight the project sustainable vehicle strategy?

Options:

A.

Three years of free parking for green vehicles

B.

Preferred parking decals for 5% of occupants utilizing carpool vehicles

C.

A permanent discounted parking rate of at least 20% for all green vehicles

D.

An annual maintenance voucher for at least 5% of occupants driving green vehicles

Question 44

What aspects of each space should the LEED consultant consider to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits?

Options:

A.

Rate of outdoor air provided per person

B.

Fire ratings of installed wall and ceiling assemblies

C.

Average number of occupants standing or seated

D.

Typical duration of occupancy in each space per day

Question 45

An owner has insisted on using a non-native or non-adapted plant species on both the vegetated roof and ground level. What Sustainable Sites credit will this decision impact the most?

Options:

A.

Site Development-Protect or Restore Habita

B.

Site Assessment

C.

Heat Island Reduction

D.

Light Pollution Reduction

Question 46

Which of the following Sustainable Sites credits are eligible to be used as a campus approach?

Options:

A.

Light Pollution Reduction, Places of Respite, Open Space

B.

Heat Island Reduction, Places of Respite, Site Master Plan

C.

Direct Exterior Access, Heat Island Reduction, Rainwater Management

D.

Heat Island Reduction, Light Pollution Reduction, Rainwater Management

Question 47

A commercial office building with a footprint of 70,000 ft2 (6 503.2 m2) has an overall site area of 200,000 ft2 (18 580.6 m2). The project design includes 15,000 ft2 (1 393.5 m2) of pedestrian oriented hardscape and 18,000 ft2 (1 672.3 m2) of vegetated open space. Which of the following is necessary to satisfy the requirement for the outdoor space to be physically accessible when calculating the Sustainable Sites Credit, Open Space?

Options:

A.

A garden space dedicated to industrial food production for use by local communities

B.

A garden space with only one vegetation type and species during the summer for visual interest

C.

A dark paving area with site elements to encourage parking near wetlands or naturally designed ponds

D.

A pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities

Question 48

Which of the following is required when documenting a LEED Pilot credit?

Options:

A.

Compliance letter

B.

LEED AP approval

C.

Innovation narrative

D.

Pilot Credit registration

Question 49

Which views would qualify as a quality view for Indoor Environmental Quality Credit, Quality Views?

Options:

A.

A, B, C

B.

B, C, D

C.

C, D, E

D.

A, B, D

Question 50

In pursuit of the Materials and Resources Credit, Building Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices, which of the following statements is true related to products purchased for temporary use (formwork, bracing and scaffolding) on the project?

Options:

A.

Temporary wood products cannot be included in the calculations

B.

If any temporary wood materials are included in the calculation, all wood materials must be included in the calculation

C.

Only Forest Stewardship Council (FSC)-certified wood materials are included in the calculation; non-certified wood materials contribute to other credits

D.

FSC-certified wood materials purchased for more than one project can be applied to other projects seeking LEED Certification

Question 51

Which of the following buildings meets the Minimum Program Requirements for LEED certification?

Options:

A.

A 1,500 ft2 (139 m2) Tourism Center located on a previously undeveloped one-acre site

B.

A 20,000 ft2 (1 859 m2) Transit Parking Garage located on a previously developed five-acre site

C.

A 2,500 ft2 (232 m2) mobile Health Clinic located on a previously constructed above-water dock

D.

A 5,000 ft2 (465 m2) Science Education center on an above-water pier that is being built specifically for the Education center

Question 52

Which of the following is required for a cooling tower or evaporative condenser in Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Alkalinity testing and ENERGY STAR® rating

B.

Non potable water sources and bacteria testing

C.

Water treatment calculations and system performance narrative

D.

Makeup water meters, conductivity controllers and overflow alarms

Question 53

A LEED Building Design and Construction: Schools project pursuing Location and Transportation Credit, Green Vehicles elects to follow Option 2. Green Buses or School-Owned Vehicles. What action must the project take to meet the Option 2 requirements?

Options:

A.

Install a preferred drop-off lane for buses meeting the emission requirements

B.

Provide calculations showing that the average fleet bus meets the emission requirements

C.

Inventory the school fleet to develop and create a plan for all buses to meet the emission requirements

D.

Document that all buses serving the project achieve a minimum green score of 30 on the American Council for an Energy Efficient Economy (ACEEE) annual vehicle rating guide

Question 54

Which of the following is required in determining the baseline for Water Efficiency Prerequisite, Indoor Water Use Reduction?

Options:

A.

Duration of use

B.

Building floor area

C.

Make and model of fixtures

D.

Proposed design fixture flow rates

Question 55

The project team wants to modify the design of an office building copy room to minimize the risk of airborne contamination to the surrounding space. The design includes a separate exhaust, but due to design constraints the partition walls of the room cannot run deck-to-deck. What can the team do to achieve Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies?

Options:

A.

Use MERV 8 (F5), or higher, filters

B.

Provide a hard-lid ceiling

C.

Create positive pressure in the room

D.

Provide a large opening to dilute air contaminates

Question 56

A new commercial building is being designed to use small capacity air handling units. To meet the requirements of the Carbon Dioxide Monitoring strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Environmental

Quality Strategies, where would CO2 monitors need to be located?

Options:

A.

In each occupied space

B.

In each densely occupied space

C.

In each occupied space and outdoors

D.

In each occupied space over 500 ft2 (46 m2)

Question 57

During the early stages of a LEED for Schools project, the team was able to reduce the number of lighting fixtures in classrooms by 25% because the project team selected paint color whose light reflectance value was 75% instead of the initially proposed 64% value. This strategy is an example of applying which of the following credits to the project?

Options:

A.

Innovation Credit, Innovation

B.

Integrative Process Credit

C.

Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

D.

Materials and Resources Credit, Interiors Life-Cycle Impact Reduction

Question 58

Under Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification, a current facilities requirements and operations and maintenance plan must contain which information necessary to operate the building efficiently?

Options:

A.

Any changes in schedules or setpoints for different seasons, days of the week, and times of day

B.

Only changes in schedules or setpoints for peak usages during seasons, days of the week, and times of day

C.

Any changes in schedules during peak times, or for different seasons, peak-usage days of the week, and times of day

D.

Any changes in schedules or setpoints focusing on only the hottest and coldest periods of the seasons, peak-use days of the week, and times of day

Question 59

Which of the following innovation proposals is most likely to be successful to achieve an Innovation Credit?

Options:

A.

Providing an educational program on the environmental and human health benefits of green building practices

B.

Including locked, indoor bicycle storage for 100% of project occupants

C.

Being located next to a 20 mi. (32 km) award-winning bicycle trail

D.

Distributing leaflets to project occupants about available public transit services nearby

Question 60

A project team seeking certification for a new school is attempting to achieve Materials and Resources Credit, Construction and Demolition Waste Management, Option 2. Reduction of Total Waste Material. What strategy can be taken to meet the requirements of this credit?

Options:

A.

Track waste materials per occupant

B.

Track waste materials used on site

C.

Document total waste by project cost

D.

Document total waste per building floor area

Question 61

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Question 62

Plug-in task lighting will be utilized in a LEED project at all workstations. The task lighting is not included in the installed lighting power calculations for Energy and Atmosphere Prerequisite, Minimum Energy Performance since

Options:

A.

it is being covered by Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control

B.

it is specifically exempted by ASHRAE

C.

it will be installed by the owner

D.

the lamp wattage has not been determined

Question 63

A LEED AP submitted a Preliminary Design and Construction review and has received a review comment and technical advice on Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning. Which of the following actions should the LEED AP do if the project continues to pursue LEED certification?

Options:

A.

Revise the documentation and resubmit the form

B.

Abandon meeting this prerequisite

C.

Submit an appeal to Green Business Certification Inc.

D.

Ask the General Contractor to be more aggressive with recycling goals

Question 64

A Healthcare Project is constructing a new building adjacent to an existing LEED Certified hospital facility. The new building's location is on the same hospital campus as the certified facility. The entire hospital campus was analyzed with an Environmental Site Assessment (ESA) as part of the certified facility's project scope. The new building project needs to complete a new Phase I ESA if

Options:

A.

the Phase II ESA uncovers suspected contamination

B.

contamination was identified by the certified facility

C.

the certified facility's Phase I ESA is older than 180 days

D.

the local equivalent standard is more stringent than ASTM E1527-05

Question 65

The owner has stated a desire to provide a variety of non-automobile commuting options for the future occupants.

What credits should the LEED AP suggest to meet this goal?

Options:

A.

Sustainable Sites Credit, Heat Island Reduction and Location and Transportation Credit, Bicycle Facilities

B.

Location and Transportation Credit, Access to Quality Transit and Location and Transportation Credit, Sensitive Land Protection

C.

Location and Transportation Credit, Surrounding Density and Diverse Uses and Sustainable Sites Credit, Open Space

D.

Location and Transportation Credit, Reduced Parking Footprint and Location and Transportation Credit, Access to Quality Transit

Question 66

An owner has requested that the project team redesign a large office building. As part of the redesign, the owner would like to move the main entrance to the opposite side of the building. Achievement of which credit may be affected by the move?

Options:

A.

Location and Transportation Credit, High-Priority Site

B.

Location and Transportation Credit, Sensitive Land Protection

C.

Location and Transportation Credit, Surrounding Density and Diverse Uses

D.

Location and Transportation Credit, LEED for Neighborhood Development Location

Question 67

What is a benefit of including the public in a charrette for a new school before the pre-design phase?

Options:

A.

Neighbors can plan for future construction

B.

It will help streamline the permitting process

C.

Potential partnerships with the community can be revealed

D.

The owner can determine financial strategies based on the public's input

Question 68

What type of project would benefit from showing compliance with Energy and Atmosphere Prerequisite, Minimum Energy Performance, Option 2. Prescriptive Compliance: ASHRAE 50% Advanced Energy Design Guide?

Options:

A.

One in which the budget and timeline would benefit from simplified decision making and analysis during the project design

B.

One in which the project team wants to explore the energy performance and load reduction effects of several envelope and lighting designs and mechanical systems

C.

One in which the project team wants to achieve efficiency trade-offs between systems, offsetting the lower efficiency of one system by the improved efficiency of another

One in which the owner wants an estimate of the carbon reductions or lower operating costs (energy savings, demand charge savings) from energy strategies, beyond a simple calculation for individual energy conservation measures

Question 69

What is the system boundary that a building life cycle analysis must be defined to account for?

Options:

A.

Cradle-to-gate

B.

Cradle-to-grave

C.

Cradle-to-cradle

D.

Cradle-to-building

Question 70

The design team and project owner decided not to pursue Energy and Atmosphere Credit, Enhanced

Commissioning, but would hire a Commissioning Authority (CxA) to oversee the requirements for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification. What is a required responsibility for the CxA to achieve the stated objective?

Options:

A.

Verify that training requirements are completed

B.

Develop systems manual for the commissioned systems

C.

Review contractor submittals for the commissioned systems

D.

Verify installation and performance of the commissioned systems

Question 71

Showers are addressed under which prerequisites and/or credits within LEED Building Design and Construction?

Options:

A.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Indoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

B.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Water Efficiency Credit, Water Metering

C.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Prerequisite, Outdoor Water Use Reduction; and Location and Transportation Credit, Bicycle Facilities

D.

Water Efficiency Prerequisite, Indoor Water Use Reduction; Water Efficiency Credit, Cooling Tower Water Use; and Water Efficiency Credit, Water Metering

Question 72

The project team has decided to substitute the flooring in the school gym with natural rubber flooring that has met the Sustainable Agriculture Standard. The cost of the substituted flooring is $80,000. The project will achieve

Options:

A.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 2. Leadership Extraction Practices

B.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials,

Option 1. Raw Material Source and Extraction Reporting

C.

Materials and Resources Credit, Building Product Disclosure and Optimization Environmental Product

Declarations, Option 1. Environmental Product Declarations

D.

Materials and Resources Credit, Construction and Demolition Waste Management, Option 1. Diversion

Question 73

Which of the following would be most useful to a school project that is attempting to pursue Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A standard garbage disposal

B.

Electronic submeter at the domestic water supply pipe to the building

C.

An open-loop HVAC system that discharges potable cooling water to a nearby lake

D.

Commercial dishwasher that is ENERGY STAR® labeled or performance equivalent

Question 74

Which of the following are the major factors determining the total irrigation requirement for a particular landscaping design?

Options:

A.

Planting density, soil conditions, irrigation efficiency and rainfall

B.

Relative humidity, site exposure, plant species and planting density

C.

Plant species, rainfall, evapotranspiration rate, site exposure and irrigation efficiency

D.

Plant species, rainwater tank size, evapotranspiration rate, site exposure and irrigation efficiency

Question 75

Which of the following are control measures recommended by the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) for the Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan?

Options:

A.

Source control

B.

Material selection

C.

Contractor training

D.

Pre-construction meeting

Question 76

Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 1. Surrounding Density requires project teams to exclude what type of land area from the calculations?

Options:

A.

Buildable land within 1/4 mi. (0.40 km) of the project boundary

B.

Public right-of-way areas within 1/4 mi. (0.40 km) of the project boundary

C.

Surface parking areas within 1/2 mi. (0.80 km) of the project boundary

D.

University campus land areas within 1/2 mi. (0.80 km) of the project boundary

Question 77

The current facilities requirements (CFR) and operations and maintenance plan (OMP) required for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification must include

Options:

A.

issue logs

B.

functional performance tests

C.

minimum outside air requirements

D.

installation verification (construction) checklists

Question 78

What phase of the integrative process gives the team the greatest chance of success in meeting the project's environmental goals cost-effectively?

Options:

A.

Design

B.

Discovery

C.

Operations

D.

Construction

Question 79

Which of the following is an example of a nonroof measure for Sustainable Sites Credit, Heat Island Reduction?

Options:

A.

A playground with artificial turf

B.

A vegetated shading structure

C.

A shade structure with a three-year aged Solar Reflectance Index (SRI) value of 0.2

D.

A paving material with a three-year aged SRI value of 0.2

Question 80

Which of the following strategies will aid in reducing indoor water use?

Options:

A.

Design drip irrigation for landscape

B.

Use high-efficiency HVAC systems

C.

Exclude janitor closets in the building

D.

Optimize consumption of showerheads

Page: 1 / 30