Question 1

Which systems must be commissioned to earn Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

Options:

A.

Fire suppression

B.

Irrigation controls

C.

Building Envelope

D.

Daylighting controls

Question 2

In a goal-setting workshop, a decision is made to place circulation at the exterior of the office perimeter next to the window wall. Which of the following is an example of integrated decision-making?

Options:

A.

Installing blinds to increase occupant comfort

B.

Darkening the color of the carpet along the perimeter to aid way-finding

C.

Lowering the heating set-point in the circulation space to conserve energy

D.

Issuing user guidelines which limit the height of occupant additions to cubicles along the perimeter

Question 3

A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary. How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?

Options:

A.

Include only the newly installed fixtures and exclude the existing fixtures

B.

Include only the existing fixtures and exclude the newly installed fixtures

C.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the flush/flow rates of the existing fixtures prior to retrofit

D.

Include all fixtures (new and existing); the baseline for the existing fixtures would be the same baseline flush/flow rates used for the new fixtures

Question 4

Using the scale of 0 = no view and 5 = maximum view, what is the view factor in the diagram below, as defined in Indoor Environmental Quality Credit, Quality Views?

Options:

A.

View Factor 1

B.

View Factor 2

C.

View Factor 4

D.

View Factor 5

Question 5

In addition to the Material Type, what other information needs to be included in the Construction and Demolition Waste Management Calculation?

Options:

A.

Waste stream, total waste, diverted waste, waste to landfill

B.

Waste volume, commingled waste, wood for energy, reused items

C.

Donated waste, landfill waste, percentage of cardboard with recycled content, diverted waste

D.

Percentage of alternative daily cover (ADC) produced by the sorting facility, total of donated items, total of wood recycled, total of wood reused

Question 6

The contractor has submitted waste hauling reports for review in order to achieve Materials and Resources Credit, Construction and Demolition Waste Management. Which of the following by-products on the documentation contribute toward the credit?

Options:

A.

Excavated soil

B.

Wood derived fuel

C.

Items sent to the local incinerator

D.

Fine waste used as Alternate Daily Cover

Question 7

A tenant implements the following strategies to reduce the amount of water used. Which strategy is applicable to the Water Efficiency Credit, Indoor Water Use Reduction for LEED Interior Design and Construction: Commercial Interiors?

Options:

A.

Composting toilet

B.

Low-flow irrigation system

C.

Commercial clothes washer

D.

Roof runoff for chiller make-up water

Question 8

For a bicycle network to demonstrate compliance with Location and Transportation Credit, BicycleFacilities, the bicycle network must connect to

Options:

A.

five bicycle trails

B.

at least eight diverse uses

C.

a restaurant, a grocery shop, a church and two bus lines

D.

a rapid transit stop that is within 3 mi. (5 km) biking distance of the project boundary

Question 9

Which of the following would achieve an exemplary performance credit?

Options:

A.

Conducting two goal setting workshops

B.

Demonstrating a 55% potable water savings

C.

Achieving an 80% parking capacity reduction

D.

Signing a one-year contract for renewable energy

Question 10

A project team member has prepared a map and an accompanying table as documentation for Location and Transportation Credit, Surrounding Density and Diverse Uses, Option 2. Diverse Uses. The map includes the location of each use, the location of the project, and the main entrance of the building. The table includes the distance to each use, the name of each use, and the category of each use. The team lead reviews the documentation and notes an important missing item. Which of the following s the most important item to add to the documentation?

Options:

A.

A description of each use

B.

The location of parking lots near each use

C.

Walking routes from the project to each use

D.

A calculation of the expected number of project occupants who will visit each use

Question 11

The WaterSense label or local equivalent requirement in Water Efficiency Prerequisite, Indoor Water Use Reduction ensures that eligible newly installed plumbing fixtures will

Options:

A.

be advertised as LEED compliant

B.

be both water efficient and high performing

C.

comply with mandatory federal government regulations

D.

comply with all international plumbing system requirements

Question 12

A project's installed water fixtures do not exceed WaterSense maximum levels. Which compliance path should the LEED AP select under Water Efficiency Prerequisite, Indoor Water Use Reduction, and what type of documentation is required to demonstrate compliance with this path?

Options:

A.

Compliance Path 1: Prescriptive Achievement; product cutsheets

B.

Compliance Path 2: Usage-Based Calculation; indoor water use calculations

C.

Compliance Path 1: Prescriptive Achievement; indoor water use calculations

D.

Compliance Path 2. Usage-Based Calculation; prescriptive compliance confirmation

Question 13

A photovoltaic (PV) system was installed after commissioning (Cx) was completed on a 35,000 ft2 (3 252 m2) project. What actions need to take place in order to meet compliance for Energy and Atmosphere Prerequisite, Fundamental Commissioning and Verification?

Options:

A.

No action is necessary as the PV system is not required to be commissioned

B.

The PV system installer should commission their own installations and share the results with the project owner

C.

The building's electrical engineer should commission the installation and share the results with the project owner

D.

The Cx agent for the project must return and conduct or oversee the commissioning of the PV system

Question 14

A project owner is seeking Location & Transportation Credit, Surrounding Density and Diverse Uses for an office that is being relocated. In order to promote walkability and reduce the distance driven by employees, which of the following solutions should the project owner consider?

Options:

A.

An employee transportation management plan

B.

A location that has retail shops within the same building

C.

An employee survey measuring occupant usage of public transit

D.

A location that is within 1/2 mi. (0.80 km) of four different basic services

Question 15

The use of MERV 13 (F7) air filters is required to obtain what credit?

Options:

A.

Energy and Atmosphere Credit, Advanced Energy Metering

B.

Energy and Atmosphere Credit, Optimize Energy Performance

C.

Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies

D.

Indoor Environmental Quality Credit, Construction Indoor Air Quality Management Plan

Question 16

Design is underway for a new tenant suite with 4,000 ft2 (371.6 m2) of net occupiable area. The project build-out will include all new HVAC systems. Operable windows are installed as follows:

· A total 75 ft2 (7.0 m2) located within 15 ft. (4.6 m) of all spaces

. A total 50 ft2 (4.6 m2) located within 25 ft. (7.6 m) of all spaces

Which design and documentation strategies must be used to demonstrate compliance with Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance?

Options:

A.

Tabulate the total area of operable windows to indicate compliance. No mechanical outside air systems required for space HVAC design

B.

Provide MERV 13 (F7) filters on the new HVAC system air handling units. No mechanical outside air systems

required for space HVAC design

C.

Provide new mechanical outside air systems in compliance with ASHRAE 62.1-2010 and document

compliance by tabulating rates in compliance with the standard

D.

Install 25 ft2 (2.3 m2) of new operable windows within 25 ft. (7.6 m) of all spaces and tabulate the total area of operable windows to indicate compliance

Question 17

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

Options:

A.

LEED Interior Design and Construction

B.

LEED Building Design and Construction

C.

LEED for Homes

D.

No rating system

Question 18

According to the Integrative Process Credit, Integrative Process the discovery phase of site selection for an existing

building should identify

Options:

A.

lighting levels

B.

operational schedules

C.

transportation options

D.

thermal comfort ranges

Question 19

Which of the following information is needed to document the non-structural elements that will be reused from the existing space in a LEED AP Interior Design and Construction project?

Options:

A.

Elevations and space plans

B.

A tracking spreadsheet and cut sheets

C.

Cut sheets and drawings indicating elements to be reused

D.

Drawings indicating elements to be reused and a tracking spreadsheet

Question 20

A client has moved into a building that has photovoltaic panels installed on the roof. Which credit applies?

Options:

A.

Indoor Environmental Quality Credit, Daylight

B.

Energy and Atmosphere Credit, Renewable Energy Production

C.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

D.

Materials and Resources Credit, Interiors life-cycle impact reduction

Question 21

Which of the following statements is correct when defining the project boundary?

Options:

A.

The project boundary must be defined by the limit of construction

B.

The LEED project boundary cannot include more than one building

C.

The gross floor area of the LEED project should be no less than 1,000 ft2 (93 m2)

D.

Contiguous land that is associated with the project that is altered as a result of construction must be included

Question 22

Which prerequisite and/or credits can be achieved by providing individual controls for lighting?

Options:

A.

Energy and Atmosphere Credit, Energy Use and Indoor Environmental Quality Credit, Interior Lighting

B.

Energy and Atmosphere Credit, Enhanced Commissioning and Indoor Environmental Quality Credit, Interior Lighting

C.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Credit, Interior Lighting

D.

Energy and Atmosphere Credit, Optimize Energy Performance and Indoor Environmental Quality Prerequisite, Minimum Indoor Environmental Quality Performance

Question 23

A project needs 5,000 ft2 (464.5 m2) of raised flooring. The tenant wants to refurbish and install an existing raised floor from another building as part of the project. If this material will equate to 14% of the overall project materials cost, which credit would this contribute towards?

Options:

A.

Innovation Credit, Option 1. Innovation

B.

Materials and Resources Credit, Construction and Demolition Waste Management

C.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 2. Leadership Extraction Practices

D.

Materials and Resources Credit, Building Product Disclosure and Optimization - Sourcing of Raw Materials, Option 1. Raw Material Sourcing and Extraction Disclosure

Question 24

In a goal-setting workshop, a project team identifies that teleworking could reduce building area and therefore the required plug loads. What is a requirement for the documentation of the energy-related systems of the Integrative Process worksheet?

Options:

A.

Providing a narrative of one plug load reduction

B.

Providing calculations of only the plug load reduction

C.

Providing explanations of at least two plug load reduction strategies

D.

Providing detailed comparative energy model before completing schematic design to evaluate energy load reduction strategies

Question 25

Which of the following sinks is classified as a private lavatory faucet under Water Efficiency Credit, Indoor Water Use Reduction?

Options:

A.

A sink in a shared office restroom

B.

A sink in a private office bathroom

C.

A sink in a private hotel room bathroom

D.

A sink in an employee restroom in a retail store

Question 26

Based on the results of a six-hour waste stream study, the team for an Interior Design and Construction Retail project plans to provide dedicated areas for four recyclable waste streams: cardboard, plastic, metal, and paper.

The project is open to the public 10 hours a day, six days a week. Which of the following actions should be the project team's top priority in order to demonstrate the minimum requirements to achieve Materials and Resources Prerequisite, Storage and Collection of Recyclables?

Options:

A.

Take appropriate measures for the safe collection, storage and disposal of batteries

B.

Make a waste stream projection for the entire year based on the six hours of the waste stream study

C.

Make a waste stream projection for the entire week, based on the six hours of the waste stream study

D.

Extend the waste stream study to cover a representative time period of a minimum of 24 hours to identify the top five recyclable waste streams

Question 27

Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?

Options:

A.

Discovery; design and construction; occupancy; operations and feedback

B.

Discovery and design; construction and occupancy; post occupancy and operations

C.

Pre-design and design; construction and occupancy; post occupancy and operations

D.

Pre-design and design; construction and pre-occupancy; post occupancy and operations

Question 28

To satisfy the Increased Ventilation strategy in the Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies, the breathing zone rates of outdoor air ventilation to all occupied spaces must be increased above the minimum rates required in ASHRAE 62.1-2010 by at least what percentage?

Options:

A.

10%

B.

20%

C.

30%

D.

50%

Question 29

A tenant space includes an open office floor plan of 100 workstations and 10 enclosed offices where each workspace is designed for individual use. Based on the requirements of Indoor Environmental Quality Credit, Interior Lighting,

what is the minimum number of occupants requiring individual controls to achieve one point?

Options:

A.

81 occupants

B.

90 occupants

C.

99 occupants

D.

100 occupants

Question 30

Best practices recommend that the LEED AP confirm that minimum program requirements have been met

Options:

A.

as part of the discovery phase

B.

as part of the final certification submittal

C.

after the design phase but before construction

D.

after the Commissioning (Cx) review but before design phase submittal